Published by the responsible public body or in an official legal record.
National Evidence Desk · core tracker cutoff 14 August 2026 · daily brief reviewed 28 September 2026
What public records show.
What is still missing.
Public records rarely arrive in one neat file. A police statement may hold the count while news reports hold names and dates. We join the pieces, show our maths and leave the gaps open.
reported 2026 road deaths are matched to accessible public incident records.
Four deaths remain unmatched. That is a public-record gap, not permission to guess.
Provisional SLPA reconstruction · core evidence cutoff 14 Aug 2026National Evidence Desk · beta
Four tools for checking road deaths, project delivery, annual totals and missing records.
SLPA does not leave every information gap as a recommendation for someone else. We search the public record, reconcile what can be reconciled, show our arithmetic and stop where the evidence no longer supports an answer.
Evidence labels
Every finding carries an evidence label.
Open the evidence labels for definitions; each tool keeps its source, calculation, uncertainty and review date visible.View the seven evidence labels
Supported by multiple independent public sources, with any remaining limits stated.
Arithmetic from cited inputs. The formula and units are shown.
A transparent event-level record assembled from accessible public reporting.
A modelled value or range whose assumptions and sensitivity must remain visible.
Relevant but incomplete evidence that may justify further investigation, not a factual conclusion.
The answer could not be established safely from the public record reviewed.
An allegation is not a rung on this ladder. SLPA publishes one only when it is materially relevant, precisely attributed and accompanied by the response and legal status available at the cutoff.
Public trackers and calculations
Public trackers and calculations
Provisional 2026 road-fatality reconstruction
At least 18 deaths in the reviewed record; 14 matched individually.
This is a public-interest reconstruction, not an official statistical series or finding of cause or fault.July police-attributed anchor: 16. Two further August deaths. This is not an official September tally.
14 deaths matched in accessible reports; reviewed 23 September 2026.
The gap is evidence that an auditable public line list is still needed.
No complete September national tally verified. Deaths and fatal collisions are different counts.
| Date | Location | Deaths | Road user | Public record |
|---|---|---|---|---|
| Cedar Heights, Vieux Fort | 1 | Vehicle occupant | Fire Service and police accounts describe a car crash, one death and two injured occupants. This is a separate event from the 21 August collision. Police and Fire Service report · 28 August 2026 ↗ | |
| Malgretoute, Micoud Highway | 1 | Scooter rider | Police reported a scooter left the road and struck a parked backhoe. The rider died; a passenger was injured. Cause and responsibility remain under investigation. Police-attributed report · 28 August 2026 ↗ | |
| Au Pos, Anse La Raye | 1 | Vehicle occupant | Vehicle left the road and descended a precipice; another occupant survived. Police-attributed report ↗ | |
| Vieux Fort–Laborie Highway, Il Pirata | 1 | Child passenger | Vehicle left the road and struck a tree; four occupants were reported aboard. Police-attributed timeline ↗ | |
| La Caye Highway, Dennery | 1 | Motorcyclist | Collision involving a motorcycle and motor vehicle. Contemporaneous report ↗ | |
| Vieux Fort–Micoud Highway | 1 | Vehicle passenger | Collision involving two moving vehicles and one parked vehicle. Police-attributed report ↗ | |
| Mac Domel / Ma Jomel, Laborie | 3 | Minibus occupants | Minibus left the road and descended a precipice. One victim’s name differs across later accounts and requires official reconciliation. Contemporaneous police-style account ↗ | |
| Dennery village | 1 | Motorcyclist | Motorcycle incident followed by transfer between medical facilities. Fire Service-attributed report ↗ | |
| Choc / John Compton Highway | 1 | Vehicle occupant | Two-vehicle collision. Public accounts differ on the occupant’s position, so no driver/passenger classification is inferred here. Police-attributed case update ↗ | |
| Marc Road, Bexon | 1 | Motorcyclist | Collision involving a motorcycle and truck. Contemporaneous report ↗ | |
| Vieux Fort–Laborie Highway, Il Pirata | 1 | Vehicle occupant | Car and omnibus collision; nine people were reported injured. Police-release republication ↗ | |
| Sandy Beach / Beanfield, Vieux Fort | 1 | Vehicle occupant | Single-vehicle collision; another occupant was reported injured. Contemporaneous report ↗ |
Method, definitions and limits
Anchor. Superintendent Troy Lamontagne reported 14 deaths through 30 June; deaths publicly reported on 22 and 26 July take the public count to 16. Two separate August fatalities bring SLPA’s provisional minimum to 18.
Reconstruction. SLPA searched accessible indexed incident reporting and counted deaths, not crash reports. Victim names are deliberately omitted here.
Limits. Four deaths remain unmatched. The record does not safely establish a complete geography, causation, fault, restraint use, impairment or a consistent 30-day classification.
Correction, 23 September. The earlier annualised projection and 2025 percentage comparison have been removed. The cited 2025 figure described fatal collisions, not an established comparable count of people killed. The 18 September Cas En Bas injuries are not added to the fatality ledger.
Revision rule. An official incident-level register supersedes this reconstruction. SLPA will preserve a dated correction note when a material record changes.
National Delivery Register · beta
Track each project from announcement to usable service.
01 · Health evidenceRegistry launched; first public output pendingNational Cancer Registry
- Latest public position
- A 6 August launch was reported after the Ministry of Health confirmed implementation support from CARPHA and IARC.
- Still missing
- Reporting facilities, completeness, registration lag, duplicate rate, current incidence and release calendar.
02 · Water≈80% reported completePatience water redevelopment
- Latest public position
- WASCO’s 29 July update reported construction progress, not an operational service result.
- Still missing
- Current cost, tested output, service zones and operating date.
03 · WaterConstruction start plannedTheobalds water project
- Latest public position
- A September start was reported after contractor selection.
- Still missing
- Current contract value, delivery dates, treatment output and service zones.
04 · WaterFirst-half 2027 start plannedJohn Compton Dam raw-water pipeline
- Latest public position
- September launch reporting gives construction in the first half of 2027 and a June 2030 completion target. CDB lists a US$22.83m partnership package and US$7.16m counterpart funding separately.
- Still missing
- Award value, quantities, current critical path and commissioned flow.
05 · WaterConstruction reported startedNorthern Pipeline
- Latest public position
- WASCO reported work started on 23 August between Bonne Terre Gap and Gros Islet Town Gap to replace the 14-inch main with a 20-inch ductile-iron pipeline.
- Still missing
- Contract value, contractor, completion date, outage plan, testing results, affected zones and verified operating improvements.
06 · HealthOne service opened; whole hospital pendingSt Jude Hospital commissioning
- Latest public position
- A 14-station dialysis unit reportedly opened on 28 July; full commissioning missed the July target.
- Still missing
- Complete unit-level pass/fail register, operating cost and full staffing plan.
07 · Digital stateProcurement stagee-Land Registry
- Latest public position
- The public RFP sets 52 weeks to operational acceptance plus 12 months of support; these are contractual targets, not delivered capabilities.
- Still missing
- Awarded supplier, contract value, start date and current milestone status.
08 · ResilienceUS$25m financing platformCastries urban flood-resilience programme
- Latest public position
- World Bank financing and implementation records establish the programme, not completed flood protection.
- Still missing
- Location-level works status, current spend, blockers and maintenance owner.
09 · EnergyUS$30m Saint Lucia financing envelopeCaribbean Efficient and Green-Energy Buildings Programme
- Latest public position
- World Bank approval establishes finance for efficiency, distributed renewables, regulation and regional procurement, not commissioned capacity or measured savings.
- Still missing
- Selected sites, current commitments, commissioned systems, energy saved and local workforce outcomes.
10 · National statistics1,524-household survey in final phase2025/26 Living Conditions and Household Budget Survey
- Latest public position
- The CSO says the survey will update the poverty profile and CPI basket. No result, weight or microdata release was public at the 7 August cutoff.
- Still missing
- Current poverty, expenditure weights, district precision, final response rate and publication date.
11 · National statistics3,040 households · validation underwayMultiple Indicator Cluster Survey 7
- Latest public position
- Fieldwork concluded in December 2025; the CSO and partners completed a July validation workshop and aim to release public results by December 2026.
- Still missing
- Current child, women, men, health, education, nutrition, time-use, WASH and water-quality estimates.
12 · HousingUS$20m facility signed · Government guaranteeAffordable housing finance and delivery pipeline
- Latest public position
- Government reports that the EC$54m facility between SLDB and Taiwan Eximbank was signed with Government as guarantor. This establishes financing capacity, not mortgages disbursed or households housed.
- Still missing
- Interest rate, maturity, drawdown conditions, guarantee exposure, borrower and deposit rules, mortgage cap, expected households, affordability burden and completed or occupied units.
What the register does, and does not claim
Each entry separates an announcement, procurement, construction milestone, commissioned asset and operating service. A percentage reported by a project owner remains attributed; it is not independently audited by SLPA.
“Missing” means the item was not located in the public material reviewed. It does not prove that the information does not exist internally.
Annual totals by time unit
See what annual totals mean per day, minute and second.
FY2026/27 debt-service budget
EC$391.0m annual input
Show formula and source
EC$391.0m ÷ 31,536,000 secondsEC$251.023 million of planned interest plus EC$140.0 million of principal, divided evenly across 365 days for scale. Principal is a financing transaction. This is neither actual spending nor a Treasury feed.
Public-finance dossier · FY2026/27 Estimates →Stay-over visitor spending
EC$3.4345bn annual input
Show formula and source
EC$3.4345bn ÷ 31,536,000 secondsHistorical annual spending distributed evenly across 2025 for scale.
SLTA-reported annual spending →LUCELEC fuel expense
EC$209.7m annual input
Show formula and source
EC$209.7m ÷ 31,536,000 secondsHistorical annual fuel expense distributed evenly across 2024 for scale.
LUCELEC annual accounts →The FY2026/27 estimated current surplus of EC$5.1 million equals about 4.76 days of the EC$391.0 million planned interest-plus-principal amount when both are compared on an even daily basis.
This is a scale comparison, not a claim that the surplus is legally available for debt service or that payments occur evenly.Anse Cochon inquiry monitor
Commissioners sworn in; inquiry period under way.
Reviewed 9 September 2026. The official record confirms the 8 September swearing-in, public proceedings, submission route and 8 March 2027 report deadline.- Commission statusAll four commissioners were sworn in on 8 September
- Named commissionersMario Michel, Cuthbert Didier, Kentry Frederick, Luke Defreitas
- Terms of referenceLaw and safety-procedure review; modern Maritime Act recommendations
- Public participationWritten or oral submissions through Secretary Lenita Joseph; detailed sitting procedures still needed
- Reporting and publicationFindings due by 8 March 2027 under the notice; public-release plan unverified
Records still needed
Open evidence gaps and the records needed to close them.
01Partly reconstructedWhat is the complete 2026 road-death and serious-injury record?
- Established
- Reviewed 23 September: 14 deaths matched to 12 incident reports. The July police-attributed anchor of 16 plus two August deaths supports a provisional minimum of 18, not a complete September total.
- Not yet known
- Four deaths, a consistent 30-day definition, serious injuries and an official event-level register.
- Best next disclosure
- Police, Health, the Coroner and CSO should reconcile one privacy-safe line list with revision history.
02No safe public estimateHow reliable is water service in each supply zone?
- Established
- Tariff changes and four current project gates are documented.
- Not yet known
- Service hours, pressure, outages, water quality and non-revenue water by zone.
- Best next disclosure
- Publish a zone dashboard before using construction progress as a reliability result.
03Denominator missingHow risky is a commercial passenger-vessel trip?
- Established
- The casualty record, sworn-in Anse Cochon Commission and public submission route are documented; the dossier separates official records, reporting and unresolved questions.
- Not yet known
- Commercial departures and passenger-trip totals, without which no defensible national rate exists.
- Best next disclosure
- Ports and operators should publish aggregate departure, passenger and safety-check totals.
04Service-level progress onlyWhen is St Jude fully ready to operate?
- Established
- A 14-station dialysis opening and the reported 471 of 721 staff are current public signals.
- Not yet known
- Unit-by-unit readiness, interdependencies, full staffing, operating cost and a replacement opening date.
- Best next disclosure
- Publish a readiness register that never turns staffing alone into a hospital-readiness percentage.
05Official totals published; full bridge still neededHow much CIP revenue becomes usable public value?
- Established
- The official FY2024/25 report records 2,957 applications received, 2,633 processed, 2,278 approvals, 355 refusals and EC$402.2 million in programme revenue.
- Not yet known
- A gross-to-net bridge across programme costs, cash and receivables, reserves, Government transfers, project allocations and completed public outcomes.
- Best next disclosure
- Publish audited aggregate financial bridges without exposing applicant identities, and do not treat gross programme revenue as spendable central-government cash.
06Official releases pendingWhat do the new household surveys change?
- Established
- SLC-HBS selected 1,524 households and is in its final phase; MICS-7 completed fieldwork across 3,040 households and advanced through national validation.
- Not yet known
- Final response, weights, quality reports, tables, microdata access and the current poverty, CPI-basket, child, household and WASH results.
- Best next disclosure
- CSO should publish a dated release calendar; policy owners should pre-register which baselines will be revised without publishing any result early.
People and responsibility
Officials and practitioners responsible for key evidence.
4 named public-record roles
People and responsibility
Officials and practitioners responsible for key evidence.
4 named public-record rolesTroy Lamontagne
Supplied the public anchor of 14 road deaths through 30 June 2026.
Road-toll report ↗Lisa Florent-Montoute
Connected road harm to productivity and called for stronger road-safety reform.
Government release ↗Desma Charles
Leads the new Coroner’s Court mandate for independent inquiry into sudden and unnatural deaths.
Government announcement ↗Christopher Alexander
Holds the published portfolio for vessel safety, seafarer licensing and marine-casualty investigation.
SLASPA profile ↗Publishing method
How SLPA publishes estimates, evidence gaps and corrections.
Read the publishing rules
Publishing method
How SLPA publishes estimates, evidence gaps and corrections.
Every reconstructed or computed figure carries its period, source, method, uncertainty and review date. SLPA will use a range when a point estimate would create false precision, and will publish “unknown” when no safe estimate is possible.
Soft signals and allegations never silently become facts. A source’s claim stays attributed to that source. Causes, legal liability and personal blame are left to the competent evidence and lawful process.
Corrections should preserve the prior cutoff, explain the change and identify the superseding record. Official data remain the authority; SLPA’s role is to make the public record easier to see, test and use.
Daily island brief
Weather and upcoming public events in Saint Lucia.
Official context: Scattered showers · possible thunderstorms · 4–6 ft seas. The optional Castries model is updating.
Official bulletin capturedScattered showers · possible thunderstorms · 4–6 ft seas
The 6:00 pm report issued on 27 September forecasts partly cloudy to cloudy skies, scattered showers, a chance of isolated thunderstorms, easterly winds near 17 mph and moderate seas of 4 to 6 feet. Moist and unstable conditions enhanced by an upper-level trough are expected across the Lesser Antilles. The current advisory page lists no rainfall, marine or dust advisory and carries heat guidance dated 26 September without an expiry time or numeric threshold. Readers should check the live official pages for later changes.
Saint Lucia Meteorological Service · 27 September at 6:00 pm · advisory page checked 28 September ↗Open the latest official advisories ↗Forecast data: Open-Meteo (CC BY 4.0). For warnings and official advice, use the Saint Lucia Meteorological Service.
Coverage is selective. No complete, machine-readable official national events feed was located.