ExperimentalProfile format under testing · reviewed 5 September 2026

Electoral constituency K · West & south

Vieux Fort South

Area covered

Vieux Fort South links the town and Moule-a-Chique with Black Bay, Augier South, La Ressource, La Tourney and the industrial/airport area. Check the electoral description for exact boundaries.

2022 household population
9,626
provisional Census
Private households
3,609
2022 Census
2010–22 reported change
+5.3%
household population
Named community entries
37
official descriptions and polling records

“Household population” is not total resident population. It counts people recorded in private households in the provisional 2022 constituency tables and excludes people outside private households.

Read this number carefully

The 2022 constituency baseline counts 9,626 people in private households and 3,609 households. Vieux Fort district, the electoral constituency, hospital catchment, water network and protected coast are different areas. No current constituency unemployment, poverty or age profile was verified. The census area-column unit is inconsistent, so no density is calculated. Place labels are not surveyed coordinates.

How to read this profile

Facts, analysis and open questions are kept separate. A proxy is a stand-in from a different geography. A project announcement is not proof of completion or results. Questions are prompts for local checking, not findings of neglect.

What stands out in Vieux Fort South?

Local economy

What supports work and livelihoods

  • Airport and port activity, manufacturing, retail, fishing and public services give the town a national role. Their local wage and supplier benefits still need a clearer public account.
  • The next opportunity is to connect existing employers and buyers to residents' skills, small firms, dependable utilities and affordable journeys.
Strengths

What this area can build on

  • A concentration of transport, production, learning and care services can support several routes into work.
  • Southern business support, youth organisations, a working fishing coast and established conservation partners provide institutions to build on.
  • Maria Major's wildlife and the beach and lighthouse landscape are assets that deserve protection alongside development.
Pressure points

What needs attention

  • St Jude's phased commissioning, airport procurement and water implementation are distinct processes with unfinished service checks.
  • Drought, flood, sargassum, waste and coastal pressures can affect households and the same national assets at once.
  • Land, training and construction announcements need to be followed through to usable homes, paid work and funded maintenance.

Population, participation, local action and source types.

Household populationProvisional Census comparison
20109,140
20229,626

+5.3% reported change

Official published turnoutPublished-register denominator · constituency and 17-seat median
Vieux Fort South48.6%17-seat median50.5%

4,851 ballots cast against 9,990 published register entries. Register-quality concerns can affect this denominator; do not read the comparison as a resident-adult participation estimate. Why this matters →

Local action tracker14 constituency-linked records in this research base
Delivered or operating3
In progress5
Planned or funded4
Status needs checking2

Status labels organise the record. They do not score performance.

Source types42 records linked on this page
Official / primary
38
Institutional / older
2
Specialist / community
2
Other / needs checking
0

These labels show where each source came from. They do not score whether a project worked.

A national gateway. A better place to live.

Vieux Fort South hosts activity that matters far beyond its boundary. Its next chapter depends on how well transport, production and public investment connect to the lives of people here.

Research reviewed 5 September 2026 · Source dates remain visible · SLPA policy analysis by Kevin L. Michel

Where national activity can become local valueA conceptual system, not a geographic map or measured economic model
01
Anchors

Airport + port + production + care

Hewanorra, seaport and Free Zone links, the industrial estate and southern health services connect Vieux Fort to wider markets and public needs.

Demand for work
and supplies ↓
02
Connections

Utilities + skills + transport + suppliers

Reliable water and power, practical training, safe journeys and firms that can meet buyer needs determine who can take part.

The local benefit
depends on these ↓
03
Daily life

Paid work + useful services + a healthy coast

Track earnings, time saved, access to care and learning, and the condition of shared places. Reinvest in maintenance and capability.

Skills and upkeep
support the anchors ↑
Town and regional services

Count the journey too

Markets, schools, shops and health services serve a wider area. Their value depends on affordable transport, walking access, dependable opening hours and residents' ability to take part.

See the access proposals →
Population: the town name is not the whole constituencyRead the numbers
Provisional 2022 constituency baseline · CSO Table 15/A.8
MeasurePublished figureInterpretation
People in private households9,626Not a 2026 estimate or a total including institutions.
Private households3,609About 2.67 people per household, calculated from the two totals.
Male / female4,763 / 4,863These sum to the constituency headline.
2010–2022 change+5.3%A historical comparison, not proof of why growth occurred or a forecast.

Detailed census rows split similar place names across constituencies. Use them with their coding and boundary vintage. The electoral directory below provides named polling areas, not coordinates or legal land parcels.

Four big investments. Different next steps.

The airport, hospital and water system do not share one opening date. The useful question is what has been verified, what remains to be done and which service residents can actually use.

Hewanorra · latest interview 12 Aug 2026

Tower and terminal are separate

The minister reported tower construction at about 95%, with technology still a separate task. For the terminal, a contractor had been selected but the agreement was unsigned.

Next evidence: signed terminal agreement; tower systems testing and operational acceptance. January/February 2027 was a hoped-for tower date.

St Jude · July–August 2026

A real service milestone, within a transition

Government reported dialysis commissioning at Augier on 30 July. The 3 August update still described phased activation across the hospital.

471staff reported
~721staff required in that update

A dated staffing comparison, not an overall care-capacity score, live headcount or list of open vacancies.

Next evidence: current service locations, approved rosters, equipment and supplies, and transport/referral arrangements.

Water · CDB record checked 5 Sep 2026

Implementation still needs operating proof

CDB lists the wider Vieux Fort redevelopment under implementation. The project aims to improve potable supply and resilience across a southern service area.

Next evidence: asset acceptance and actual supply hours, pressure and water quality by zone. A lender's website review date is not a site inspection.

Administrative Complex · announcement to verify

A promised restart needs a current record

The detailed government announcement proposed restarting construction in early 2025, retaining a theatre. We did not locate a current primary work record or opening certificate.

Next evidence: signed obligations, works and spending, planned service moves, theatre operation and annual upkeep.

Follow the water all the way to the tap.

The Grace and Beausejour system supports a wider southern area. Its sources, pipes and users cross electoral boundaries. Plan reliability with neighbours rather than assigning the whole network to one constituency.

Dated observation · 12 June 2026

Source stress persisted

WASCO reported reduced southern flows including Grace and Beausejour. Vieux Fort/Laborie valving arrangements were being finalised. The wider percentage reductions cannot be assigned to every local household.

Proposed operating account

Separate three failure points

  1. Source: raw flow and water condition.
  2. Treatment: safe output and plant uptime.
  3. Distribution: pressure, hours and losses by zone.

A new plant can be valuable while an end-of-line household still has poor service.

Essential service continuity

Check the combinations

Test water, electricity, communications, road access and waste handling together at schools, care sites and food businesses. No current constituency-wide outage, wastewater or broadband-performance series was located.

Open the water policy package →

The coast is working infrastructure.

Beaches, landings, islands and wetlands support several uses at once. Keep fishing, recreation, coastal protection and habitat condition in the same decision, with the right authorities involved.

1,038 haSLNT's described Pointe Sable protected coastal system

This wider area is a shared regional asset. It is not the size of Vieux Fort South, a map of legal parcels or a claim that all its wetlands and bays lie inside this constituency.

Sargassum: track usable access, equipment and disposalOpen response tests

Government's November 2025 record establishes receipt of response equipment and identifies Vieux Fort as affected. It does not show today's local conditions or how quickly access is restored.

  1. Agree priority landings and access points with users.
  2. Record who activates equipment and whether it is available.
  3. Protect workers and habitat; monitor sand removed with biomass.
  4. Use an approved destination and record collection and disposal costs.
  5. Test contaminants and a real buyer before promoting a new product.
Connect to SLPA's sargassum work →

Count the income after the activity.

Training, registrations and a handover are useful steps. Follow them far enough to see whether people earn, businesses survive and support is available when needed.

Published unemployment rates · 2025Vieux Fort administrative district; not a constituency estimate
Both sexes13.60%
Male12.73%
Female19.05%

Bars use a 0–25% scale. These survey rates are not Vieux Fort South estimates or shares of all residents. The visible CSO table does not give local sample sizes or confidence intervals.

Read the CSO district table ↗
Delivered regional service · May 2026 report

Business help is closer to the south

Commerce says its Southern Extension opened in February 2025 and had handled more than 400 business registrations regionally. Its May Vieux Fort workshop enrolled 40 participants.

What this tells us: a working support channel exists. It does not mean 400 new businesses in Vieux Fort South, or demonstrate higher earnings.

Next test: repeat sales, business survival, paid invoices and local supplier access to major buyers.

A useful logistics test before a large new facilityInspect the proposal

CDB/ITC's study, based on 2023 fieldwork, identified missing airport cold storage and logistics-skills needs. First audit today's capacity, buyers and actual volumes. Then test a small cold-chain service with booked demand, reliable power and water, food-safety controls and an operating budget.

Measure spoilage, service costs, on-time delivery, repeat customers and producer margins. Expand when results support it. The historical diagnosis is not proof that every gap remains unchanged in 2026.

The opportunity is real. The outcome is conditional.

The historical population rise and current investment signals do not produce a forecast by themselves. Watch the links between capacity, local access and the costs left behind.

Strengths

Transport and production assets; schools and business-support routes; local organisations; a distinctive working coast and globally important wildlife.

Weaknesses

Documented utility stress and incomplete operating evidence. Public records often stop before sustained earnings, affordable occupancy or reliable service can be assessed.

Opportunities

Buyer-led training and supplier work; coordinated hospital access; a viable cold chain; serviced land; coastal stewardship with clear responsibilities.

Threats

Travel and trade shocks; drought, flooding and sargassum; invasive species; unfunded maintenance; training without demand; large projects that weaken future choices.

SLPA synthesis, not a resident survey or a score for a public official. Missing published data does not prove an agency has no information or that a service has failed.

Scenario 01

The connections improve

Utilities stabilise, care becomes easier to reach and local firms meet repeat buyer demand. Residents gain steadier work across more than one sector.

Watch: service hours, retained earnings, repeat sales and funded upkeep.
Scenario 02

Activity grows, gains stay narrow

Projects and throughput expand while transport barriers, service interruptions and weak supplier access limit resident benefits.

Watch: employment quality, household costs, participant dropout and payment delays.
Scenario 03

A shock exposes shared weaknesses

Storm, drought or external demand loss interrupts several employers and services. Recovery spending crowds out planned improvements.

Watch: tested backups, reserves, alternative access and income diversity.

These are conditional scenarios, not assigned probabilities, growth projections or an assertion that one path is inevitable.

Start small enough to learn. Follow through to results.

These are SLPA proposals for discussion. Proposed leads need lawful authority and agreement; timelines begin at adoption. They are not government commitments or a claim to speak for every resident.

Package 01Make water and critical services dependableOpen plan

Start with the hours of safe service people receive, then work back to the repairs and investment required.

Proposed lead
WASCO with Health, NURC, Infrastructure and critical-site operators; the council helps gather local access problems.
First 90 days
Within 90 days of adoption, agree service zones, record supply hours and pressure, publish water-quality results and test backup water and power at care sites, schools and fish-handling facilities. Identify households unable to buy storage.
Months 3–12
Over months 3–12, repair high-loss sections, verify treatment and reservoir acceptance, and coordinate drainage and road works. Run the same tests through wet and dry conditions.
Measure
Supply hours, pressure failures, sample compliance, outage duration, tanker response and essential services cancelled. Show each zone and missing observations.
Scale or stop
Do not declare the redevelopment successful from installed capacity alone. Add demand only where the operator can demonstrate adequate service and safe wastewater handling.
Fund delivery
Separate capital contracts from annual electricity, chemicals, staff, spares and maintenance. Publish the unfunded operating requirement and cost of interim support.
Package 02Connect major employers to local earningsOpen plan

Help residents and small firms win sustained work from the airport, port, hospital, industry and tourism economy.

Proposed lead
Commerce's Southern Extension with Invest Saint Lucia, employers, skills providers and worker representatives.
First 90 days
Ask participating employers for real vacancies and purchase needs. Recruit a small, openly selected cohort. Fund transport, childcare or disability access where these prevent participation. Set a baseline before training begins.
Months 3–12
Link paid placements to supervised work and recognised credentials. Test small supplier contracts with clear specifications and prompt payment. Compare outcomes with a suitable baseline or comparison group.
Measure
Paid starts, 90- and 180-day retention, hours and earnings; repeat supplier sales, margins and payment delays. Separate Vieux Fort South residents from the wider southern catchment.
Scale or stop
Expand after sustained earnings or viable repeat sales improve. Redesign courses with no employer demand, unpaid placements or high dropout. Protect fair access and competitive procurement.
Fund delivery
Cost support per sustained placement, including supervision and participant expenses. Use existing institutions first; avoid creating a new office before testing the service.
Package 03Make the St Jude transition work for patientsOpen plan

Treat service location, staffing and the journey to care as one southern health-access plan.

Proposed lead
St Jude Hospital and Health, with transport providers, disability groups and neighbouring councils.
First 90 days
Publish a dated service-by-service location guide and referral arrangements. Audit journeys from town, Black Bay, La Ressource and neighbouring communities. Test backup utilities, handovers and accessible transport.
Months 3–12
Pilot scheduled patient transport where justified. Align each service transfer with staff, equipment, supplies and clinical approval. Plan any stadium transition separately with its future operator.
Measure
Missed appointments attributable to travel, transfer times, cancelled services, staff coverage and backup uptime. Use anonymous aggregate reporting with suitable clinical oversight.
Scale or stop
Move a service only when its clinical team accepts readiness and continuity arrangements. A building handover or staffing percentage is insufficient.
Fund delivery
Show recurrent staffing, supplies, maintenance and transport costs separately from reconstruction spending. Do not fund new services by leaving essential recurring costs unprovided.
Package 04Keep the working coast productive and accessibleOpen plan

Protect fishers' livelihoods, beaches and habitat while improving sanitation, safety and market access.

Proposed lead
Fisheries and the fishers' co-operative with SLNT, SLASPA, Health, waste services and coastal businesses.
First 90 days
Confirm fisheries-complex works and inspect water, ice, cold storage, safe landing and waste routes. Map lawful public access and sensitive habitat using official boundaries and local checks.
Months 3–12
Pilot reliable cold-chain and buyer services before building expensive new capacity. Agree sargassum collection, worker protection and approved disposal. Restore wetland water flows only after site assessment.
Measure
Fishing days lost, spoilage, net fisher income, equipment uptime, sanitation failures, access closures and repeat shoreline or habitat observations.
Scale or stop
Require usable landings, viable operating costs and environmental approval before expansion. Do not scale a sargassum product without contaminant testing, safe handling and a viable buyer.
Fund delivery
Cost operations across a full season. Publish equipment ownership, replacement provision and transparent charges; test insurance affordability and exclusions before subsidising uptake.
Package 05Make town improvements earn their upkeepOpen plan

Improve the everyday routes between homes, shops, buses, schools and services while keeping future land choices open.

Proposed lead
Infrastructure, the council, Housing/NHC and DCA, with utility operators, vendors and public-transport representatives.
First 90 days
Publish a joined register for the administrative complex, land lots, roads and drainage: responsible office, permission, contract, actual stage, access arrangements and next evidence due. Walk key routes with residents.
Months 3–12
Bundle modest drainage, shade, lighting, crossings and accessible footpath repairs. Disclose lot servicing, affordability and selection criteria before treating land announcements as delivered homes.
Measure
Accessible route continuity, rain-related closures, defects, journey costs, occupancy of serviced lots and maintained public facilities. Record displaced activity and construction disruption.
Scale or stop
Keep land assembly and long commitments conditional on demand, utilities, drainage and transparent terms. Occupancy requires service acceptance and safe access, not only a title or road cut.
Fund delivery
Publish costed options, contingencies, annual upkeep and the named operator. Make smaller, reversible improvements where they solve the immediate problem.
Package 06Link safety, support and youth opportunityOpen plan

Build on local support and learning services while testing what improves people's safety and prospects.

Proposed lead
Equity, Education, Police and community organisations, with independent safeguarding and consent procedures.
First 90 days
Verify counselling-room availability, confidential referral routes and staff coverage. Identify school-to-work gaps with young people. Agree an anonymous baseline and a small pilot with trusted providers.
Months 3–12
Pair case support and paid learning pathways with safer public routes and victim support. Evaluate delivery and outcomes; protect access regardless of political affiliation.
Measure
Referral waiting time, support completion, school or paid-work retention, repeat victimisation where safely measurable, and residents' reported safety using a consistent method.
Scale or stop
Change providers or programme design when safeguarding fails or referrals cannot be met. Never use an old crime designation, arrests alone or participant counts as proof of current safety.
Fund delivery
Fund qualified supervision, confidentiality, transport and follow-up as part of the service. Do not publish identifiable case records or stigmatise a neighbourhood.

What changes after the first effect?

  1. O1 · Direct incidence

    Water repairs, new hiring, transport support and construction change costs, access and disruption for identifiable people and firms.

  2. O2 · Adaptation

    Households change travel and storage; firms adjust hiring, prices and suppliers. A new building or road may attract demand that was not in the original plan.

  3. O3 · Propagation

    Effects move through households, firms, government, external accounts, finance, institutions and natural/infrastructure assets. More activity also means utility, waste and maintenance loads.

  4. O4 · Inherited state

    The next shock encounters either skills, diverse buyers, reserves and dependable services, or fragile livelihoods and infrastructure with no funded operator.

Stress test: combine low water supply, a power interruption and a disrupted access route. Check the hospital, food handling and households together. This is a proposed causal test, not a quantified simulation.

Explore RIPPLE-4 →

Keep future choices usable.

Protect the floor

Safe water and care, rights and fair access, confidential support, lawful coastal access and ecological safeguards remain essential.

Make the minimum useful commitment

Fund repairs, current evidence, service continuity and bounded employer/buyer pilots. Do not postpone essential maintenance while waiting for a larger scheme.

Keep major commitments conditional

Stage long leases, permanent coastal structures, new facilities and large demand increases against verified capacity, operating costs and alternatives.

Set the next decision

Name the lawful owner and budget. Review the baseline at 90 days and the pilot after a relevant operating cycle. Respond immediately to a serious safety or rights failure.

IIR: understand existing institutions and functions before replacing them. PITONS: keep evidence, alternatives, authority, delivery and review together in a public decision record. These are applications, not conformance certifications.

Search method, coverage and remaining limitsRead the method

Reviewed on 5 September 2026. The starting point was SLPA's existing constituency research base, checked against CSO census tables and the Electoral Department. Searches combined Vieux Fort/Vieux-Fort, named facilities and communities, project names, and 2025/2026 status terms.

Priority went to government, SLASPA, CDB, World Bank, FAO, SLNT and institution/operator records. Later local reporting was used to update specific gaps and is labelled. Indexed summaries are identified in the source register where full content was unavailable. This is a structured public-source review, not an exhaustive archive audit, field survey or set of agency confirmations.

Publication dates, event dates and retrieval dates are distinguished. National funds, district survey rates, project catchments and constituency figures are not added or relabelled. Job and completion targets remain projections. The Finance estimates PDF could not be reopened; Vieux Fort South budget amounts are omitted pending revalidation.

Current neighbourhood age, poverty, incomes, disability access, commuting, service reliability and many completion records remain gaps. These should guide the next evidence request and local consultation.

The communities inside Vieux Fort South.

These names come from official electoral descriptions and polling-place records. A community may cross everyday social or service boundaries.

37 selected place labels

  • Augier SouthK2 · K4
  • Bacadere
  • Bacadere WestK2
  • BeanefieldK1 · K3
  • Belvedere HillK2
  • Black BayK2 · K4
  • CantonementK3 · K4
  • Christopher RowK2
  • Clarke Street EastK1
  • Clarke Street WestK2
  • Coco Dan
  • Coco Dan EstateK4
  • Commercial StreetK2
  • Derriere MorneK3
  • Georgie PointK4
  • Henry AvenueK2
21 additional named entriesOpen listClose list
  • Hospital HillK2
  • Industrial EstateK4
  • Jesse/CalvaryK2
  • La RessourceK3
  • La TourneyK3
  • MalgretouteK2
  • MarketK2
  • Martin Luther King StreetK2
  • Morne BeausejourK1
  • Moule-a-ChiqueK1
  • New Dock LaneK1
  • Smith Henry AvenueK2
  • St Jude HighwayK3
  • St Jude Highway WestK4
  • St Paul's LaneK1
  • Vieux Fort town
  • Vieux Fort Town EastK1
  • Vieux Fort Town WestK2
  • Vieux Fort/Laborie HighwayK2 · K4
  • Warrican RowK2
  • Westhall GroupK1

34 of 37 entries carry a polling-district code in this release. A missing code means it was not present in the assembled source rows, not that the place sits outside a polling district.

Boundary resources

Check the official description and reference map.

Vieux Fort South reference map (PDF)Central Statistical Office · map vintage 2010 (opens in a new tab)Current constituency descriptionSaint Lucia Electoral Department · site availability can vary (opens in a new tab)

The CSO PDF is an older official reference map with a 2010 map vintage. It may not show later boundary or coding changes. Use it alongside the current official Electoral Department description when that page is available.

Schools, health, safety and climate information.

These notes identify assets, service gaps and risks. They do not turn the number of notes into a performance score.

Education

Schools, skills and community buildings

  • Vieux Fort Comprehensive, CAPE and SALCC's Southern Extension provide pathways. The 2026/27 bursary notice includes southern study, but its July deadline has passed.
  • The WDC fair and school health event are documented 2025 activities. Current attendance, learning, disability access and sustained job outcomes remain gaps.
Health

Care and service access

  • The July dialysis milestone and August phased-commissioning update should guide a service-by-service transition account. Confirm department locations with the hospital before travel.
  • Staff coverage, transport, equipment, supplies and backup utilities determine access. A whole-hospital operational-readiness score was not verified.
Safety

Public safety and emergencies

  • The counselling room at Vieux Fort Police Station adds a private setting for support. Staff coverage and successful referrals must be checked separately.
  • NEMO named Vieux Fort South in the March 2026 tsunami drill plan. Follow current official instructions, not an old drill notice or shelter list.
  • The 2023 crime designation and 2025 landfill-fire warning are historical records, not current crime or air-quality readings.
Climate and environment

Hazards, coast and resilience

  • Manage coastal access, wetlands, drainage and national transport facilities as a connected system, with shared responsibilities across boundaries.
  • Source stress and sargassum responses have dated evidence. Current tap reliability, beach conditions, local power and broadband uptime are not measured here.

Ideas to test locally in Vieux Fort South.

These are SLPA proposals for discussion and local validation. They are not an official plan, ranked mandate or finding about what residents want.

  1. 01

    Start with the hours of safe service people receive, then work back to the repairs and investment required.

    SLPA synthesis
  2. 02

    Help residents and small firms win sustained work from the airport, port, hospital, industry and tourism economy.

    SLPA synthesis
  3. 03

    Treat service location, staffing and the journey to care as one southern health-access plan.

    SLPA synthesis
  4. 04

    Protect fishers' livelihoods, beaches and habitat while improving sanitation, safety and market access.

    SLPA synthesis
  5. 05

    Improve the everyday routes between homes, shops, buses, schools and services while keeping future land choices open.

    SLPA synthesis
  6. 06

    Build on local support and learning services while testing what improves people's safety and prospects.

    SLPA synthesis
Existing assets and reported action

What the current evidence says is in place

  • Official records document a commissioned dialysis unit, delivered business training and a refurbished survivor-support room.
  • Water and fisheries programmes are active, while youth and education institutions offer existing routes for support. These are a base for improvement, not proof of universal outcomes.
Questions to check locally

Open questions for local checking

  • Which service failures cost residents the most time or income, and which modest fixes can reduce them?
  • Which local firms can meet real hospital, airport, manufacturing and tourism purchase needs?
  • Do new jobs and serviced land reach people facing transport, childcare, disability or income barriers?
Open 6 testable policy questions
  1. Needs checking

    Make water and critical services dependable

    How to check: Supply hours, pressure failures, sample compliance, outage duration, tanker response and essential services cancelled. Show each zone and missing observations.
  2. Needs checking

    Connect major employers to local earnings

    How to check: Paid starts, 90- and 180-day retention, hours and earnings; repeat supplier sales, margins and payment delays. Separate Vieux Fort South residents from the wider southern catchment.
  3. Needs checking

    Make the St Jude transition work for patients

    How to check: Missed appointments attributable to travel, transfer times, cancelled services, staff coverage and backup uptime. Use anonymous aggregate reporting with suitable clinical oversight.
  4. Needs checking

    Keep the working coast productive and accessible

    How to check: Fishing days lost, spoilage, net fisher income, equipment uptime, sanitation failures, access closures and repeat shoreline or habitat observations.
  5. Needs checking

    Make town improvements earn their upkeep

    How to check: Accessible route continuity, rain-related closures, defects, journey costs, occupancy of serviced lots and maintained public facilities. Record displaced activity and construction disruption.
  6. Needs checking

    Link safety, support and youth opportunity

    How to check: Referral waiting time, support completion, school or paid-work retention, repeat victimisation where safely measurable, and residents' reported safety using a consistent method.

Current stage of projects and commitments.

Status reflects the latest clear source in this research base. “Planned,” “under way” and “operating” are different claims.

Project stageDelivered or operatingA source reports that the project opened, was handed over or is operating.Open 3 recordsClose 3 records
30 July 2026

St Jude dialysis at Augier

Latest sourced status: The dialysis unit was officially reported commissioned

A unit-specific milestone, not evidence that every hospital service transferred. This is part of the commissioning record above, not an additional hospital investment to sum.

S245Government of Saint Lucia /
28 May 2026

Southern Extension business support and May training

Latest sourced status: Regional office activity and a Vieux Fort workshop documented

Measure sustained sales, paid work and business survival next. Regional registrations cannot be counted as constituency business formation.

S263Department of Commerce
19 June 2026

Vieux Fort Police Station counselling room

Latest sourced status: Refurbished private room handed over

Follow up on trained staffing, confidential access, referrals and maintenance. Physical delivery alone does not establish service availability.

S264Equity
Project stageIn progressA current source shows construction, procurement, commissioning or another active delivery step.Open 5 recordsClose 5 records
3 August 2026

St Jude Hospital: phased commissioning

Latest sourced status: Clinical activation remained phased in the latest official update

The building was handed over in November 2025. Staff, equipment, utilities and procedures must be ready for each service. This is a shared southern facility; its electoral parcel is not asserted here.

S244Government of Saint Lucia / S246Government of Saint Lucia /
12 August 2026 latest interview

HIA terminal and ancillary infrastructure

Latest sourced status: Procurement advanced; minister said contractor selected but agreement unsigned

The 2025 RFP covered terminal and related works. Award, mobilisation, construction and operational opening remain separate checks.

S242Government of Saint Lucia / S243St Lucia Times; direct inter
12 August 2026 latest interview

HIA control tower

Latest sourced status: Minister reported about 95% physical construction

Technology installation is a separate step. Hoped-for January/February 2027 operation is a target, not a verified opening date.

S243St Lucia Times; direct inter
February–August 2026

FISH-ADAPT: Vieux Fort site assessment and access to finance

Latest sourced status: Local site visits and national programme development documented

The islandwide programme is not a Vieux Fort funding allocation. Track local follow-through, safer equipment, affordable finance and reduced workday losses.

S259Food and Agriculture OrganizS260Agriculture / FAO
Project stagePlanned or fundedFunding, a budget line or an announced plan exists, but delivery is not yet established.Open 4 recordsClose 4 records
11 December 2024 detailed announcement

Vieux Fort Administrative Complex and theatre

Latest sourced status: A restart was announced; actual current construction stage is unverified

Obtain a current contract, work record, financing obligations and service-opening plan. A promised 2025 start is insufficient for an active-construction label.

S247Government of Saint Lucia /
25 February 2026 follow-up

Vieux Fort Fisheries Complex modernisation

Latest sourced status: The latest follow-up still described work as expected shortly

An earlier EC$1 million allocation was announced. No current spending, completion or operating certificate was located. Check water, ice, sanitation and maintenance.

S155Govt. of Saint LuciaS252The Voice; account of minist
9 April 2026 latest announcement

Land rationalisation and announced Vieux Fort South lots

Latest sourced status: Land opportunities announced; serviced delivery and transfers unverified

Reconcile the newer lots announcement with existing regularisation so plots and beneficiaries are not double-counted. Verify legal title, services and affordability.

S265Government Information ServiS268Govt. of Saint Lucia
Inherited 2026/27 budget record

George Odlum Stadium rehabilitation

Latest sourced status: A budget line was retained from the earlier research base

The finance PDF could not be reopened on 5 September. Amount is omitted pending revalidation. Care transition, stadium works, operator and actual sports reopening must be checked separately.

S006Government of Saint Lucia, M
Project stageStatus needs checkingThe latest public source does not establish the current stage clearly enough.Open 2 recordsClose 2 records
14 April 2025; kickoff 24 March

HIA solar carport and charging

Latest sourced status: Official construction kickoff verified; later commissioning not verified

The announced build duration has elapsed. Request acceptance, generation, charger uptime and maintenance evidence instead of assuming completion.

S248Government of Saint Lucia /
25 August 2025 company release

Baron multi-facility complex

Latest sourced status: Groundbreaking reported; current delivery needs checking

Company-announced XCD45 million and 150 permanent jobs at full operation are projections. No current independently verified completion, net jobs or local-hiring total was located.

S251Baron Group press release hoS154National Printing Corporatio
National programmes relevant to this areaNational envelopes are not local allocationsOpen 4 recordsClose records

These programmes apply across Saint Lucia. The amounts below are national 2026/27 budget envelopes; this research base does not establish how much is allocated to or spent in Vieux Fort South.

National programme

Community Development Programme

Budgeted in 2026/27 Estimates; no constituency split supplied in this dataset Inherited budget record; the finance PDF could not be reopened on 5 September 2026, so its amount is omitted pending revalidation.

S006Government of Saint Lucia, M
National programme

Community Tourism Programme

Budgeted in 2026/27 Estimates; no constituency split supplied in this dataset Inherited budget record; the finance PDF could not be reopened on 5 September 2026, so its amount is omitted pending revalidation.

S006Government of Saint Lucia, M
National programme

Tourism Enhancement Programme

Budgeted in 2026/27 Estimates; no constituency split supplied in this dataset Inherited budget record; the finance PDF could not be reopened on 5 September 2026, so its amount is omitted pending revalidation.

S006Government of Saint Lucia, M

Review the findings, sources and missing information.

The notebook keeps sourced facts, institutional context and SLPA analysis visible as different kinds of evidence.

How the evidence labels work
Published fact

A sourced official or primary record

Institutional context

An older or broader institutional source

SLPA synthesis

Analysis that must not be read as an official finding

Hypothesis

A testable question that needs local evidence

Research notesKey numberOpen 2 findingsClose findings
  1. Published factElectoral constituency; provisional Census

    CSO Table 15/A.8 reports 9,626 people in private households and 3,609 households in 2022; the reported 2010–2022 change is +5.3%. This is a historical baseline, not a current population forecast.

    S254CSO
  2. ProxyAdministrative-district survey proxy; not constituency data

    The published 2025 Vieux Fort district unemployment rate is 13.60%; male 12.73%, female 19.05%. These cover the wider district, not Vieux Fort South. Sample sizes and confidence intervals are not shown in the visible table.

    S014CSO
Research notesEconomyOpen 3 findingsClose findings
  1. Needs checkingVieux Fort South and named shared services

    Baron's company statement reports an August 2025 groundbreaking. Its investment and job numbers are announced projections; current output and net local employment gains were not verified.

    S251Baron Group press release hoS154National Printing Corporatio
  2. Needs checkingVieux Fort South and named shared services

    The Free Zone operator lists an existing warehouse/office base. CDB/ITC's 2023 fieldwork identifies cold-chain and logistics-skills opportunities that need a current capacity audit.

    S249Saint Lucia Free Zone operatS250Caribbean Development Bank /
  3. Needs checkingVieux Fort South and named shared services

    FISH-ADAPT assessed Vieux Fort landing sites in 2026 and advanced national finance/insurance work in August. Local allocations, completed repairs and new policy uptake were not supplied.

    S259Food and Agriculture OrganizS260Agriculture / FAO
Research notesInfrastructure and servicesOpen 3 findingsClose findings
  1. Needs checkingSouthern water service area

    CDB still lists the Vieux Fort water redevelopment under implementation. June 2026 source reductions included Grace and Beausejour. Neither record establishes September household reliability.

    S240Caribbean Development BankS256WASCO / Government of Saint
  2. Needs checkingVieux Fort South and named shared services

    Airport terminal procurement, tower construction and CATCOP safety works require separate status checks. A minister's August interview is the latest located tower/terminal update, not a completion certificate.

    S242Government of Saint Lucia / S243St Lucia Times; direct interS253World Bank
  3. Needs checkingVieux Fort South and named shared services

    Land rationalisation and over 100 announced lots need separate checks for surveying, service connections, allocation, affordability and title transfer.

    S265Government Information ServiS268Govt. of Saint Lucia
Research notesEducationOpen 1 findingsClose findings
  1. Needs checkingVieux Fort South and named shared services

    Documented youth support, bursary pathways, careers and school wellbeing activity provide existing channels. Attendance alone cannot establish learning, employment or crime outcomes.

    S266Government of Saint Lucia / S267EducationS269HealthS270Workforce Development Centre
Research notesHealthOpen 1 findingsClose findings
  1. Needs checkingSt Jude Hospital; shared southern catchment, parcel assignment not established here

    Government reported dialysis commissioning at Augier on 30 July 2026 and continuing phased hospital commissioning on 3 August. These are different from the November 2025 building handover.

    S244Government of Saint Lucia / S245Government of Saint Lucia / S246Government of Saint Lucia /
Research notesSafetyOpen 1 findingsClose findings
  1. Needs checkingVieux Fort South and named shared services

    A private counselling/interview room was handed over at Vieux Fort Police Station in June 2026. Service availability and referral completion need their own evidence.

    S264Equity
Research notesEnvironment and climateOpen 1 findingsClose findings
  1. Needs checkingShared protected coastal system; not all within Vieux Fort South

    Pointe Sable's wider protected coast supports livelihoods and biodiversity. A 2022 study discussed erosion and mangrove hydrology; current condition and delivery of recommended works remain to be checked.

    S255Saint Lucia National TrustS257Saint Lucia National TrustS258Durrell Wildlife Conservatio
Research notesWhat is workingOpen 1 findingsClose findings
  1. Needs checkingVieux Fort South and named shared services

    Commerce reports delivered southern business services and training. Registrations and attendance are regional outputs, not a count of jobs created in this constituency.

    S263Department of Commerce
Research notesElection factOpen 1 findingsClose findings
  1. Official recordelectoral constituency

    election date: 2025-12-01; registered electors: 9990; ballots cast: 4851; turnout percent: 48.56; winner votes: 3564; winner valid vote percent: 75.2; runner up: Leanna Eva Johannes-Paul (UWP), 1,145 votes; other candidates: David Troy Charles (IND) 18; Choix Z. C. Melchoir (IND) 14; rejected ballots: 110; geography: electoral constituency;

    S002Electoral Dept.
Open evidence gaps

What we still need to know

  1. 01

    A current constituency profile of age, disability, income, poverty, employment, housing costs and commuting.

    District averages and programme catchments cannot show who gains or misses out locally.

    Useful next source: CSO boundary-consistent extracts, uncertainty notes and privacy-safe employer and household evidence.
  2. 02

    Water and wastewater service-zone outcomes, electricity/broadband reliability and critical-site backups.

    National assets share local utility dependencies. A project status cannot demonstrate continuity at the tap or workplace.

    Useful next source: WASCO, NURC, LUCELEC, communications providers and facility operating logs with date and denominator.
  3. 03

    HIA signed contract, current component schedule, solar commissioning and reconciled financing.

    Tower, terminal, air-safety works and solar have different contracts and readiness requirements.

    Useful next source: SLASPA awards, financing schedules, engineer certificates and operating acceptance records.
  4. 04

    St Jude service locations, staff coverage, transport access and each transfer's approval.

    The regional health benefit depends on reliable care, not a construction or recruitment headline.

    Useful next source: Hospital and Health service directory, approved rosters, anonymous missed-appointment and transfer records.
  5. 05

    Current coastal-study follow-through, habitat condition, sargassum operating results and fish-handling performance.

    The coast carries livelihoods and shared infrastructure risks across electoral boundaries.

    Useful next source: SLNT, Fisheries, SLASPA, councils, Health and waste operators; verified legal geographies and repeat field checks.
  6. 06

    Administrative-complex progress, serviced-lot transfers, industrial jobs and local supplier results.

    Announcements, construction, paid work, affordable occupancy and sustained earnings are different outcomes.

    Useful next source: Project contracts, NHC/ISL allocation records, agency procurement and privacy-safe employer/participant follow-up.
  7. 07

    Current support-service availability, youth-programme continuity and comparable safety indicators.

    Old events, room handovers and historical crime orders do not prove current coverage or effectiveness.

    Useful next source: Agency and provider service checks, safeguarding review and anonymous outcome evidence with small sensitive counts suppressed.
Source register42 records linked to this profileOpen sourcesClose sources
  1. S002
    2025 General Election Results (opens in a new tab)

    Saint Lucia Electoral Department · 2025-12-01

    Official / primary
  2. S006
    Estimates of Revenue and Expenditure 2026/2027 (opens in a new tab)

    Government of Saint Lucia, Ministry of Finance · 2026

    Inherited budget source could not be reopened on 5 September 2026. Vieux Fort South amounts are omitted pending revalidation; this does not establish absence of funding.
    Official / primary
  3. S116Official / primary
  4. S145Official / primary
  5. S154
    Saint Lucia Government Gazette, 27 January 2025 (opens in a new tab)

    National Printing Corporation / Government of Saint Lucia · 2025-01-27

    Official / primary
  6. S155Official / primary
  7. S157
    Statutory Instruments 2023 - Escalated Crime Area Orders (opens in a new tab)

    National Printing Corporation / Government of Saint Lucia · 2023-07-13

    Official / primary
  8. S014
    Unemployment Rates by District and Sex (Annual) 2010 to 2025 (opens in a new tab)

    Central Statistical Office of Saint Lucia · 2026-04-02

    Current primary labour-force table. The site displays the ambiguous raw date 2/4/2026; normalized here as 2 April 2026 under Saint Lucia's day/month convention while retaining the raw value. Districts are not constituencies.
    Official / primary
  9. S113
    Vieux Fort South (K) (opens in a new tab)

    Saint Lucia Electoral Department

    Official / primary
  10. S149Institutional / older
  11. S240
    Vieux Fort Water Supply Redevelopment (opens in a new tab)

    Caribbean Development Bank · Live record retrieved 2026-09-05; approval December 2020

    Current lender status is not an inspection or household-service result. The public card does not explicitly identify the currency of its displayed total.
    Official / primary
  12. S241
    Water redevelopment initial scope (opens in a new tab)

    Government of Saint Lucia / OPM · 2020-08-10

    The 20,000 is a project service estimate, not Vieux Fort South census population. Historical funding scopes cannot be added to later CDB record.
    Official / primary
  13. S242
    HIA terminal construction procurement (opens in a new tab)

    Government of Saint Lucia / SLASPA · 2025-07-14

    RFP is not a signed contract or evidence of work completed.
    Official / primary
  14. S243
    Airport tower and terminal latest interview (opens in a new tab)

    St Lucia Times; direct interview with Infrastructure Minister Shawn Edward · 2026-08-12

    The percentage describes minister-reported physical tower construction, not certified operational readiness. The terminal agreement was still unsigned in this interview; dates are expectations.
    Specialist / community
  15. S244
    St Jude building handover (opens in a new tab)

    Government of Saint Lucia / GIS · 2025-11-17; ceremony 2025-11-16

    Do not label November 2025 a full hospital reopening. The facility serves the south; the exact Augier parcel/boundary must be separately checked.
    Official / primary
  16. S245
    St Jude dialysis unit commissioned at Augier (opens in a new tab)

    Government of Saint Lucia / GIS podcast · 2026-07-30

    Confirms this unit, not every hospital department.
    Official / primary
  17. S246
    St Jude phased commissioning and staffing (opens in a new tab)

    Government of Saint Lucia / GIS podcast · 2026-08-03

    Staffing figures are reported at source date, not a live count. 250 apparent shortfall is arithmetic, not confirmed vacancies all open for hiring.
    Official / primary
  18. S247
    Vieux Fort Administrative Complex (opens in a new tab)

    Government of Saint Lucia / OPM · 2024-12-11

    The detailed record announces a restart. No current primary construction or opening record was located in this review.
    Official / primary
  19. S248
    HIA solar carport (opens in a new tab)

    Government of Saint Lucia / SLASPA · 2025-04-14

    Official kickoff is established. Current commissioning, generation, charger uptime and savings were not verified.
    Official / primary
  20. S249
    Saint Lucia Free Zone facilities (opens in a new tab)

    Saint Lucia Free Zone operator · Undated live facility page retrieved 2026-09-05

    Do not infer present occupancy, job totals or vacant units from the list. Archived acreage descriptions differ; avoid unverified acreage.
    Official / primary
  21. S250
    Logistics Chain Study for Saint Lucia (opens in a new tab)

    Caribbean Development Bank / International Trade Centre · 2023 fieldwork; PDF publication date not independently established

    Fieldwork was conducted in March–April 2023. Its cold-storage and logistics diagnosis requires a current capacity check before new investment.
    Official / primary
  22. S251
    Baron Group multi-facility expansion (opens in a new tab)

    Baron Group press release hosted by St Lucia News Now · Release 2025-08-25; published 2025-08-29; sod turning 2025-08-21

    Groundbreaking and projected investment/jobs are company statements. Current completion and net additional local employment were not independently verified; concessions are a separate legal record.
    Official / primary
  23. S252
    Fisheries complex refurbishment followup (opens in a new tab)

    The Voice; account of minister remarks · 2026-02-25

    No newer dated official completion certificate located. Keep planned/funded status until verified.
    Specialist / community
  24. S253
    National air transport connectivity original funding (opens in a new tab)

    World Bank · 2020-05-28

    Additional financing documentation exists in March/April 2026 but document body not accessed; do not call US$45m current final project cost.
    Official / primary
  25. S254
    2022 Census: provisional constituency and settlement tables (opens in a new tab)

    Central Statistical Office · August 2024 revision

    Table 15/A.8: 9,626 people in private households; 3,609 households; male 4,763 and female 4,863. Settlement labels are census allocations, not surveyed neighbourhood boundaries.
    Official / primary
  26. S255
    Pointe Sables Environmental Protection Area (opens in a new tab)

    Saint Lucia National Trust

    The wider protected coastal system is 1,038 hectares. It crosses local geographies; not all its habitats lie in Vieux Fort South. Authorisation and biosecurity govern island access.
    Official / primary
  27. S256
    Southern water sources remain low (opens in a new tab)

    WASCO / Government of Saint Lucia · 12 June 2026

    Grace and Beausejour source reductions are reported. Vieux Fort/Laborie valving was being finalised. Regional percentage reductions cannot be assigned to this constituency; this is not a September reading.
    Official / primary
  28. S257
    PSEPA and Ma Kôté mangrove consultations (opens in a new tab)

    Saint Lucia National Trust · 21 July 2022

    Studies identified coastal erosion and mangrove hydrological problems. Discussed interventions are not certified completed works or a current condition survey.
    Official / primary
  29. S258
    Saint Lucia racer conservation (opens in a new tab)

    Durrell Wildlife Conservation Trust

    Maria Major refuge and invasive-species vulnerability. No current animal count, breeding result or unrestricted visitor access is inferred.
    Institutional / older
  30. S259
    FISH-ADAPT: fisheries climate resilience and safety (opens in a new tab)

    Food and Agriculture Organization · 12 February 2026

    Vieux Fort landing sites and co-operatives were included in assessment visits. National beneficiaries and funding cannot be assigned to the constituency.
    Official / primary
  31. S260
    FISH-ADAPT: access to finance and insurance (opens in a new tab)

    Ministry of Agriculture / FAO · 26 August 2026; meeting 19 August

    National product-development and finance-readiness work; not proof that new loans or insurance policies have been issued to Vieux Fort fishers.
    Official / primary
  32. S261
    Equipment for the sargassum response (opens in a new tab)

    Ministry of Agriculture · 6 November 2025

    Receipt of tractors and beach-cleaning equipment is established. Vieux Fort deployment, uptime, access restoration and disposal outcomes are not.
    Official / primary
  33. S262
    CARIBE WAVE 26 public drill notice (opens in a new tab)

    NEMO · 13 March 2026

    Vieux Fort South was included in the planned 19 March simulation. A drill notice is neither proof of exercise completion nor a current tsunami warning.
    Official / primary
  34. S263
    Southern business support and training (opens in a new tab)

    Department of Commerce · 28 May 2026

    Southern Extension opened February 2025; more than 400 business registrations were reported regionally. May training in Vieux Fort enrolled 40. These are service outputs, not constituency employment outcomes.
    Official / primary
  35. S264
    Counselling room at Vieux Fort Police Station (opens in a new tab)

    Ministry of Equity · 19 June 2026

    A refurbished private counselling/interview room was handed over under STOP GBV. Staffing, confidential access and referral outcomes require separate verification.
    Official / primary
  36. S265
    Vieux Fort South 2026/27 budget proposals (opens in a new tab)

    Government Information Service · 9 April 2026

    Official indexed episode summary announces over 100 lots. Full episode not transcribed; site names are not silently normalised. Servicing, allocation and title transfers are unverified.
    Official / primary
  37. S266
    Ubuntu youth after-school programme (opens in a new tab)

    Government of Saint Lucia / USAID Y-RIE · 9 September 2024

    A completed 14-week cohort involved more than 50 young people across Vieux Fort communities. Ongoing 2026 funding and causal safety outcomes are not established.
    Official / primary
  38. S267
    Government bursary programme 2026/27 (opens in a new tab)

    Ministry of Education · 9 April 2026

    Includes SALCC Southern Extension and Vieux Fort Comprehensive CAPE. July 31 deadline has passed; no open application or local award count is claimed.
    Official / primary
  39. S268
    Land rationalisation and affordable homeownership (opens in a new tab)

    Government of Saint Lucia · 26 April 2024

    Programme commencement includes Vieux Fort North and South and Dennery. No constituency-specific title-transfer total or household affordability result supplied.
    Official / primary
  40. S269
    Vieux Fort Comprehensive health and wellbeing event (opens in a new tab)

    Ministry of Health · 19 September 2025; event 12 September

    Delivered school event includes physical and mental wellbeing. It is not a local prevalence survey or long-term health outcome.
    Official / primary
  41. S270
    WDC career fair in Vieux Fort (opens in a new tab)

    Workforce Development Centre · 25 September 2025; event 19 September

    Official indexed report of a delivered fair at Independence Square. Direct page timed out; no attendee total or placement outcome inferred.
    Official / primary
  42. S271
    House of Assembly current members (opens in a new tab)

    Government of Saint Lucia · Roster checked 5 September 2026

    Lists Danny Marvin Butcher for Vieux Fort South. The unusual URL is the government published roster.
    Official / primary