ExperimentalProfile format under testing · reviewed 5 September 2026

Electoral constituency I · West & south

Choiseul

Area covered

Choiseul joins the village and working coast to La Pointe, Delcer, Morne Sion, La Fargue, inland farming settlements, Saltibus and Piaye. The official polling descriptions reach well beyond the village waterfront.

2022 household population
10,424
published A.8; tables conflict
Private households
3,883
published A.8; tables conflict
2010–22 reported change
N/C
boundary/coding break
Selected place labels
66
official descriptions and polling records

“Household population” is not total resident population. It counts people recorded in private households in the provisional 2022 constituency tables and excludes people outside private households.

Read this number carefully

Choiseul village, district and constituency are different geographies. Census Table 7/A.8 reports 10,424 household residents and 3,883 households; A.10's Choiseul aggregate gives 7,119 and 2,615. Reconcile the geographic coding before using the apparent 2010–22 change. Population rank and trend are withheld; see the census audit.

How to read this profile

Facts, analysis and open questions are kept separate. A proxy is a stand-in from a different geography. A project announcement is not proof of completion or results. Questions are prompts for local checking, not findings of neglect.

From the maker’s bench
to the working coast.

Skills with deep roots. A community with work to do—and people who know how to do it.

Press play to explore the working waterfront. A silent 10-second camera orbit shows the compact village, church and separate belfry, fishing basin, coastal works and road climbing inland. Original illustrative 3-D study; not to scale. Relief and selected buildings are interpreted. This is not a survey, navigation or hazard model.
Visual references, still image and animation source

The scene uses original modeled geometry informed by public aerial and waterfront photographs, historical JICA plans and the port contractor’s completion photographs. Reference photographs are not copied into the artwork. The historical layout and visible later works guide the illustration; submerged works, precise dimensions and current water depths are not represented.

What can you do now?

Practical first steps for your work, household or organisation.

Choose your starting point

Start with one costed, deliverable order.

  1. Choose one product and record materials, working time, packing and delivery costs. Try the calculator below.
  2. Prepare photographs, dimensions, capacity and lead time. Ask a buyer what they would actually order.
  3. Ask NSDC about current Choiseul centre access and training; ask Export Saint Lucia about buyer and shipping support.

Confirm opening hours and programme availability before travelling.

Sources for the guidance

What stands out in Choiseul?

Local economy

What supports work and livelihoods

  • Skilled hands connect this community: pottery and basketry, fishing and sea moss, farming and the work of teaching. There are real facilities and organisations to build on. The next test is whether they make a working week more dependable.
  • A paid commission. A functioning landing site. Water when it is needed. Buyers who come back. Start there, measure the result and expand what works.
Strengths

What this area can build on

  • Women potters and other practitioners carry deep, adaptable knowledge; named artists and educators show how local experience can travel and return.
  • The upgraded craft centre, cooperative activity and recent farm training offer usable starting points.
  • Village and inland institutions can connect learning, local trade and accessible services.
Pressure points

What needs attention

  • Craft succession needs paid teaching and worthwhile work, not goodwill alone.
  • Port construction, ongoing monitoring and funded maintenance are different milestones; current operating evidence remains incomplete.
  • Recent Delcer water stress, dispersed service access and contradictory census totals require precise local follow-up.

Population, participation, local action and source types.

Household populationProvisional Census comparison

Conflicting totals; trend withheld.

Table 7/A.8 reports 10,424 household residents; A.10 gives 7,119. Geographic reconciliation is needed.

Read the census audit →
Official published turnoutPublished-register denominator · constituency and 17-seat median
Choiseul59.8%17-seat median50.5%

5,705 ballots cast against 9,539 published register entries. Register-quality concerns can affect this denominator; do not read the comparison as a resident-adult participation estimate. Why this matters →

Local action tracker11 constituency-linked records in this research base
Delivered or operating7
In progress1
Planned or funded1
Status needs checking2

Status labels organise the record. They do not score performance.

Source types56 records linked on this page
Official / primary
33
Institutional / older
18
Specialist / community
4
Other / needs checking
1

These labels show where each source came from. They do not score whether a project worked.

More than a stop on the west-coast road.

Choiseul’s history lives in clay, cultivated ground, fishing knowledge, music, institutions and the stories people choose to keep.

Several histories meet here.

The government’s historical account records Indigenous petroglyphs and the association of Pointe Carib with Indigenous settlement. It also describes canoe making, fishing and farming. Those connections matter. They do not justify claiming that Indigenous ancestry disappeared, or that every later craft has one unchanged origin.

Patricia Fay’s Creole Clay offers a more specific account of pottery: women potters whose self-sufficient Creole way of life developed after nineteenth-century emancipation, with African inherited production methods, family transmission and continual adaptation. This review draws on the book’s publisher description and scholarly record. The distinction changes policy. Protect the practitioner’s knowledge, income and capacity to adapt.

Finola Jennings-Clark’s 2010 field account describes local clay, family labour, preparation, coiling, drying and open firing in places including Morne Sion, Matin, Fiette and La Pointe. Making a pot takes work before there is anything to sell. A sensible craft programme should ask about material access, arduous preparation and the cost of time as well as packaging and promotion.

Remember the people who worked the estates.

At Balenbouche, research published in 2026 brings enslaved people’s lives and resistance into the history of the sugar works. It records 203 enslaved people in 1815 and documented escape attempts in 1827; the sugar works were largely abandoned by 1896. The authors worked with local archaeological and educational partners during 2022 fieldwork.

The current electoral record lists Balembouche in I9. The spelling differs from the estate and research literature. Interpretation should connect these records carefully, and place labour, resistance and community knowledge alongside the surviving machinery and buildings.

A heritage announcement needs a next chapter.

The National Trust’s 2020 statement welcomed efforts to acquire and protect a Morne Sion windmill property. This review did not establish completed acquisition, restoration or current public access. Ask for that record before advertising a visit. Care for heritage includes ownership, upkeep and permission.

People worth learning from.

Some were born here. Others grew up here, taught here or contributed through local institutions. Those relationships are stated explicitly; older accounts do not imply current activity.

01

Catty Osman

A 2010 firsthand account places Osman’s pottery hut at Morne Sion and describes its use for teaching. Patricia Fay’s professional record documents Osman demonstrating Caribbean bonfire pottery in Fort Worth in March 1998. The university’s later account recognises her contribution to Fay’s research.

Lesson for Choiseul. Pay experienced makers as teachers and knowledge holders. Their expertise can support local learning and international exchange.

Sources
02

Irena Alphonse

Alphonse also took part in the 1998 international demonstration. Jennings-Clark’s 2010 visit records her showing students a sculptural cocoa-farmer figure, alongside traditional pottery practice and learning from Eudovic.

Lesson for Choiseul. Give makers room to adapt. A tradition can remain recognisable while its practitioners develop new forms and customers.

Sources
03

Daniel Jean-Baptiste

In his own biography, Jean-Baptiste connects childhood fishing from Choiseul’s wooden jetty with the marine and tropical life in his silk paintings. A familiar waterfront became a lasting source of artistic material.

Lesson for Choiseul. Help young people observe, make and document their own surroundings. Local experience can support a distinctive creative practice.

Sources
04

Llewellyn Xavier

John Robert Lee’s signed review identifies Xavier as Choiseul-born and discusses his 2024 Cultural Icon exhibition, including ecological themes and work with recycled materials.

Lesson for Choiseul. Invite established artists into sustained local programmes: workshops, school visits and public conversations tied to actual work.

Sources
05

Heran Jn Baptiste

Interviewed in June 2004, Jn Baptiste described learning fishing from his father, playing a homemade banjo as a child and performing with the La Pointe Shack-Shack band. His story documents how livelihood and musical knowledge can share the same family and community networks.

Lesson for Choiseul. Ask elders which skills and stories they want passed on. Record with consent, return copies and budget for the time involved.

Sources
06

Pauline Antoine-Prospere

ECLAC’s 2025 biography records a 37-year education career, including seven years as Delcer principal and ten at Grace, teaching in Saltibus and Piaye, and service through the Saltibus Credit Union.

Lesson for Choiseul. Build leadership across schools and community organisations. Practical administration and patient follow-through are community assets.

Sources
07

Jady Emmanuel

The athletics association’s 2025 CARIFTA team record identifies Emmanuel with Choiseul Athletics. Local reporting locates her home community in Morne Paul, Laborie. Her connection illustrates the reach of Choiseul’s learning and sporting institutions across neighbouring communities.

Lesson for Choiseul. Support the surrounding system: qualified coaching, regular practice, transport, school support and inclusion. Be precise about where a person comes from.

Sources
08

Vincent Eudovic

In a 2004 interview, the sculptor described returning from Trinidad to teach at La Fargue’s government training centre and helping shape the handicraft centre. The account also records his 1972 UNESCO scholarship to Nigeria.

Lesson for Choiseul. Make room for skilled people to return and teach. Institutions grow through continuing instruction and exchange.

Sources

The next generation needs a reason to stay with the work.

There is a centre to use and a history of reaching buyers. The unfinished task is dependable access, paid learning and orders that leave makers better off.

The building is an asset. Put its operating terms in public.

Government’s October 2025 account describes an approximately EC$800,000 upgrade of the existing Arts and Crafts Centre, with NSDC as custodian. Studios, training and exhibition space, offices and equipment were part of the investment.

The immediate request is straightforward: a current timetable, named coordinator, equipment access, maker selection and selling terms. This review did not locate a current tenant list, training intake or earnings series.

Follow the order all the way to payment.

The Maryland shipment is a useful example because a buyer introduction in 2021 led to inspection, an order and completed shipment in 2022. It is an earlier achievement, not evidence of a new 2026 export.

Repeat the useful sequence with a manageable group. Cost the product. Confirm what the buyer wants. Pack a test piece. Agree delivery and payment. Then track the next order.

In August 2026, National Trust deputy director Finola Jennings-Clarke again described the risk of craft knowledge losing successors. Earlier CDF work had already identified poor returns, arduous work and weakened commercial channels. A paid master-and-learner commission addresses both transmission and the working conditions around it. That is the proposal; its results still have to be demonstrated.

Public broadcast post

Real FM’s 31 August Facebook caption also flags the craft-succession concern. The full post and video were unavailable; the MBC account and Daily Post article provide readable corroboration.

Local visitor trade can complement household and wholesale sales. Leo and Hattie Barnard’s River Dorée gallery is one existing enterprise, separate from the NSDC centre. Its published schedule closes in August and September, so confirm reopening before planning a visit or referral.

Does the order pay for your time?

Try an invented example, then enter your own figures. All money fields use EC dollars. This is a simple costing aid, not a forecast of local earnings.

Will this order pay for your time?

Use a small batch to test your price before committing to a larger order. The starting values are an invented example—not Choiseul market prices or a recommended wage. Replace them with your own costs.

Surplus after valuing your time

EC$90.00

This is what remains after the entered batch costs, sales fee and value of your time. It is not a forecast or a complete business profit figure.

Sales
EC$300.00
Sales fees
EC$30.00
Direct batch costs
EC$90.00
Value of your time
EC$90.00
Break-even price per item
EC$16.67
Calculation and limits

Sales = items × price. Surplus = sales − sales fees − materials − packaging/other costs − delivery − hours × hourly value. Break-even price = batch costs including time ÷ [items × (1 − fee percentage)].

Count all production costs, including materials used on rejected items, against the sellable items. Add appropriate overhead to other batch costs. Taxes, borrowing, currency conversion and unsold inventory need separate consideration. Values stay on this page; saving creates a worksheet on your device.

Construction is one milestone. A usable port is a daily test.

A fisher needs access, handling space, ice for keeping the catch cold and a route to a buyer. Every part needs somebody responsible for keeping it working.

Keeping fish cold. Keeping the shoreline usable.

A 2003 government account describes Choiseul’s ice-making plant as part of the fishing facility. This is manufactured ice for preserving catch. That historical record does not establish today’s availability, price or a shortage.

St. Lucia Times reported sargassum landings in Choiseul and Soufrière in May 2025. Seaweed and harbour sand are different problems. Record the current location, date and effect before choosing a response; the 2025 report is not a September 2026 shoreline update.

2022 agreement

A wider programme

JICA’s grant scope includes coastal works, dredging and monitoring with possible modification after construction.

2024 contractor record

Construction completion

Hazama Ando explicitly lists 2024 as the completion year. The public portfolio does not establish present channel depth or a handover date.

May 2026 procurement

Maintenance planning

UBEC requested life-cycle maintenance and sustainable-financing plans including Choiseul. Award and accepted outputs were not found.

The indexed Japan/UN commitment gives a programme horizon ending 31 March 2027; the full page was unavailable during review. JICA’s retrieved scope already shows why construction and subsequent monitoring can have different dates. That is a reasonable interpretation, pending the handover and monitoring records. It is not a finding that all port issues are solved.

Keep more value from what is landed.

Start with a short operating log: blocked access, availability and cost of fish-preservation ice, equipment downtime and fish rejected or spoiled. Bring fishers, vendors, the operator and Fisheries into one discussion. Ask what can be repaired, who is competent to do it, and where the recurring money comes from.

Grenada’s experience below shows why facilities, repair capacity and customers have to be planned together.

Sea moss: test the business as well as the technique.

Agriculture’s December 2024 record documents cooperative raft-farming support, training, processing space and reported US FDA registration. Registration does not mean product approval or prove export revenue. Before putting in money, ask about membership, permitted production, quality requirements, buyer arrangements and costs.

FISH-ADAPT’s February 2026 report includes Choiseul in fisheries assessments. Ask Fisheries about confirmed local opportunities and dates. Its island-wide target must not be presented as a Choiseul allocation.

Inland Choiseul belongs at the centre of the plan.

Saltibus, Delcer, the farming settlements and the Piaye end of the constituency need practical access to buyers, water, care and decisions.

Make farm services usable.

The January 2026 Agriculture account documents hands-on tillage training in Choiseul under BRACCCVAS. The useful follow-up is a machinery service people can understand: what is available, who operates it, how to book, the charge and what happens when it breaks. Buyer specifications should guide production before a grower spends more on expanding it.

A tank helps. Water still has to reach the household.

Victoria’s 100,000-gallon storage facility opened in August 2024. Its reported service area includes Belle Vue, Dacretin, Derriere Morne, Morne Sion, Fond Cacoa, Bois Den and Mongouge.

WASCO’s 18 August 2026 Delcer notice makes a different distinction: a transmission restriction at Unionville had been resolved, restoring former plant capacity, while low source flows continued. These are different constraints. A useful local record follows supply hours and faults by service zone, alongside the repairs and source conditions that explain them.

Confirm the service before making the journey.

Delcer Wellness Centre reopened in August 2025 after SMART rehabilitation, including water-storage and accessibility work. La Fargue’s January 2026 notice documents outreach and a published Monday–Friday 8 a.m.–4:30 p.m. schedule, with Saturday 8 a.m.–noon. Confirm current hours and the particular service before travelling.

A rotating assistance day in existing inland venues could help residents complete agreed applications and referrals. It needs a receiving agency, a trained operator, working supplies and a follow-up route. The Bhutan evaluation below explains why a computer alone is insufficient.

Use district evidence carefully.

SLPA’s household-infrastructure analysis identifies housing and information-access concerns using Choiseul district data and published definitions. It can guide questions about access. It cannot identify current constituency households needing help, establish income poverty or measure hours of water service.

Read the district analysis and definitions →

Know the stage. Ask the next question.

The 28 July 2026 tender seeks drilling services for three exploratory wells, including a projected 1,500-metre well at Saltibus. The published bid deadline is 7 October 2026.

As of this review, the tender establishes procurement for exploration. It does not establish an award, drilling start, commercially usable resource or lower household bills. The bid requirements include a Local Labour Method Statement; actual local work and its duration should be reported as it happens.

Residents can ask now

  • Which stage has been reached, and what is the dated timetable for my area?
  • What access, traffic, noise, water and restoration arrangements apply?
  • How are affected people informed, concerns recorded and responses followed up?
  • Where will genuine local work or training opportunities be advertised?

A published route for concerns

The project’s grievance mechanism names community liaison officer Windia Jaunai: 758-732-0030 and grievances.resdp@govt.lc. It also publishes an online form and feedback-box locations including Saltibus Post Office.

Keep a copy and ask for a reference. The published acknowledgement standard is two working days; that is a service commitment, not a verified performance rate. Confirm physical access before travelling.

Borrow the practice. Understand its limits.

Four useful mechanisms from Samoa, Bhutan and Grenada. These are evidence-informed adaptations for Choiseul; their local results are not guaranteed.

Samoa · heritage work

Pay while the piece is being made.

Women in Business Development links sponsored fine-mat production to contracts, payments during production, fortnightly progress visits and financial-literacy support. Master teaching helps transmit finer techniques.

Choiseul adaptation: a small commissioned craft apprenticeship with separate teaching fees, learner support and agreed milestones.

Limit: continuing buyers and field administration cost money. The evidence describes an operating practice and participant experience; it does not establish average hourly earnings or a causal income gain.

Bhutan · craft trade

Connect training to an actual order.

The EU–Bhutan project's 2022 closing account reports 320 new textile-handicraft designs and more than 2,000 units exported. Design, production and marketing support were connected to transactions.

Choiseul adaptation: a short catalogue, tested packaging, identifiable buyers and one reliable fulfilment contact.

Limit: exported units are not net maker income. A separate ITC ecosystem study found gaps in growth-stage, packaging and follow-up support; it was not an evaluation of the EU programme.

Bhutan · dispersed services

Help people finish the task near home.

UNDP's 2013 G2C evaluation found reported travel and time savings from assisted local services. It also found only 23 of 101 centres online, missing consumables, unfinished agency processes and a likely need for subsidy.

Choiseul adaptation: rotating assistance in existing venues, agreed with the agencies that can complete the work.

Limit: this is a historical evaluation with fieldwork constraints. Budget operators, printing and follow-up; measure completed cases and repeat journeys before adding centres.

Grenada · fisheries operations

Plan repairs, fish-preservation ice and the buyer.

Gouyave's evaluation documents daily machine logs and technician visits, but also prolonged ice-machine failure and weak use of a new market. A later equipment evaluation, conducted in December 2022, found ice production at 55% of its 2019 target and constraints in staffing, spare parts and maintenance finance.

Choiseul adaptation: an operating compact with repair cover, backup ice for fish handling, replacement reserves and vendor participation.

Limit: the evaluations cover different investments and periods; COVID restricted later site visits. They show why construction and dependable service need separate measures.

A programme leadership can begin now.

SLPA proposals, not adopted policies or funding commitments. Start with three agreed priorities, obtain local costs and publish what changes within 90 days.

First 30 days: publish craft-centre terms, obtain port operating records and choose a small set of village and inland service problems with residents.

Days 31–90: deliver a paid craft commission, test agreed buyer or assistance arrangements, and report repairs, payments and completed tasks.

02

Build one dependable order, packing and booking service

Help makers retain more from a sale and give visitors a bookable local experience.

Who leads. Craft association and NSDC with Export Saint Lucia, participating makers, local hosts and transport operators.

What residents can do. Prepare photographs, dimensions, materials, capacity, lead time and a costed price. Test packaging with a sample. A host can refer a small pre-booked group to a consenting maker and agree the maker's payment first.

First steps, cost, measures and decision point
Start
Choose a few products and identifiable buyers. Publish an order contact and delivery terms; test a shared packing session. Offer a short demonstration only when the maker, venue, accessibility and transport arrangements are confirmed.
Next
Reconcile payments after each order or visit. Record breakage and delays, improve the weakest step and try a repeat booking. Use approved export advice for destination requirements before accepting plant-material or food-related orders.
Pay for it and maintain it
Allow for packaging, rejected pieces, photography, freight, booking administration, cleaning and insurance where relevant. Show deductions and payment dates to suppliers. Start with existing premises.
Measure
On-time orders; damage and returns; net maker receipts; repeat customers; paying visitors; supplier payment time.
Decision point
Promote more widely after the first deliveries work. An old export shipment or a workshop attendance count does not establish a sustainable business.
03

Give the fishing port an operating and maintenance compact

Reduce lost fishing days and avoidable loss of value between landing and sale.

Who leads. Fisheries Department, the responsible facility operator and Choiseul Fishermen's Cooperative, with UBEC, engineers and vendors.

What residents can do. Keep a voluntary four-week record of access interruptions, availability and cost of fish-preservation ice, handling losses and equipment downtime. Ask the cooperative about current sea-moss membership, raft access and purchase arrangements before investing.

First steps, cost, measures and decision point
Start
Obtain the construction handover and current sedimentation records. Ask UBEC whether its maintenance consultancy was awarded. Walk the landing-to-sale process with users and name the owner of each recurring problem.
Next
Publish inspection frequency, competent repair cover, dredging decision triggers, spare-parts arrangements, a backup supplier of ice for keeping fish cold and an affordable financing proposal for lawful approval. Include vendors in any change to selling locations.
Pay for it and maintain it
Budget staff, electricity, water, cleaning, qualified inspections, servicing and replacement reserves. Separate the construction grant from annual operations; consult users on fees before the responsible authority decides.
Measure
Blocked-access days; surveyed channel condition; fish-preservation ice availability; repair response; equipment uptime; fish rejected or spoiled. Higher catches alone are not proof of healthy fish stocks.
Decision point
Commission qualified technical work where needed. A contractor's completion year does not prove current navigability, nor does registration establish sea-moss profitability.
04

Connect shared farm machinery to real buyer demand

Make training and equipment useful to small growers without expanding production into an uncertain market.

Who leads. Agriculture extension and participating farmers, with machinery operators, processors and willing household, hospitality or institutional buyers.

What residents can do. Ask your assigned extension officer about machinery access and safe-operation training. Record the crop, expected harvest window and realistic quantity you can offer. Ask a buyer for quality, quantity and collection requirements.

First steps, cost, measures and decision point
Start
Publish booking, charges, trained-operator and maintenance rules for available machinery. Test orders for two or three crops with buyers who agree quantities and payment dates. Match land preparation to the crop and terrain with extension advice.
Next
Review machine waiting time and failed deliveries. Consolidate collection when it saves growers money. Explore school supply only with authorised meal managers, nutrition and food-safety staff, within their purchasing rules.
Pay for it and maintain it
Account for fuel, operator time, transport, repairs, replacement, crates and order coordination. Obtain local quotations before setting a service fee; disclose any subsidy and its budget holder.
Measure
Machine hours and waiting days; cost per serviced plot; fulfilled orders; produce left unsold; payment delays; voluntary net receipts.
Decision point
Expand when buyers return and equipment can be maintained. Tillage training is not evidence of a measured yield increase or a machine entitlement.
05

Measure reliable water at the end of the pipe

Make water service improvements visible in homes, schools, clinics and small businesses.

Who leads. WASCO with the Ministry of Physical Development and Public Utilities, essential facilities and participating residents.

What residents can do. Keep dates and hours of actual supply and report leaks with a location. Ask for a case reference. Follow current WASCO notices and use harvested rainwater for non-potable purposes as advised; leave valves and network equipment to authorised personnel.

First steps, cost, measures and decision point
Start
Use a small voluntary log across Delcer, Victoria-linked areas and inland settlements. Separate low source flow, transmission faults, storage and distribution problems. Publish dated zone information and a clear escalation route.
Next
Agree and fund priority repairs, recurring tank and network maintenance, and continuity arrangements at essential facilities. Compare logged service before and after each intervention; investigate persistent unequal access.
Pay for it and maintain it
Identify the responsible operating budget for inspections, repairs, monitoring and essential-facility continuity. Price major works separately after engineering assessment; do not infer a constituency allocation from a national envelope.
Measure
Supply hours with a consistent definition; repeated interruptions; leak response; facility disruption; repairs still working at follow-up.
Decision point
Do not promise continuous supply on the strength of a tank opening. The August 2026 Delcer notice showed source scarcity could persist after a transmission restriction was resolved.
06

Take assisted services to existing inland venues

Reduce repeat journeys for applications, learning and care, including from Saltibus and dispersed settlements.

Who leads. Local government and participating receiving agencies, with schools, health teams, trained operators and accessible community venues.

What residents can do. Record the task, fare and number of visits a service has required, without publishing private documents. Ask the receiving office what can be completed locally. A school-approved mentor can offer a regular learning slot.

First steps, cost, measures and decision point
Start
Select two or three existing venues and a short list of services. Confirm agency contacts, an operator, accessible hours, connectivity, printing supplies and paper or telephone alternatives. Publish La Fargue and Delcer service contacts and confirm appointments before travel.
Next
Run rotating assistance sessions for applications, business records and agreed referrals. Pair outreach with receiving-service capacity and targeted transport support. Schools and clubs should plan sustained practice, qualified supervision and inclusion.
Pay for it and maintain it
Fund operator time, travel, consumables, connectivity, device repair, supervision and agency follow-up. Track the recurring cost per completed task before extending the timetable.
Measure
Completed cases; repeat trips; waiting days; estimated travel cost saved; referrals completed; sustained learner participation.
Decision point
Expand when receiving agencies can finish the work. Helpers must not retain passwords or unnecessary personal records. A clinic refurbishment does not establish a disease reduction.
07

Give Saltibus a clear geothermal information and follow-up desk

Let residents understand exploratory work, raise concerns and see whether promised local opportunities materialise.

Who leads. RESDP project team and Physical Development/Public Utilities, with affected residents, land users and the competent environmental and technical agencies.

What residents can do. Use the published project contact to ask about your location, access, anticipated disruption and grievance procedure. Keep dated correspondence and submit private land or compensation documents directly to the authorised team.

First steps, cost, measures and decision point
Start
Publish a plain-language stage update: tender, award, mobilisation, drilling, testing and later decisions. Explain the Saltibus well's purpose and current timetable. Reconfirm the grievance route, local labour process and safeguards with residents.
Next
Before mobilisation, disclose applicable traffic, noise, water, incident-response and restoration arrangements, alongside a process for resolving affected people's concerns. Report recruitment by actual local paid starts, training and duration.
Pay for it and maintain it
Identify project-funded consultation, monitoring, access restoration and grievance capacity. Distinguish those costs from a future power plant and long-run generation finance.
Measure
Dated milestones; concerns acknowledged and resolved; agreed safeguards disclosed and checked; local paid work; restoration completed.
Decision point
Treat the July 2026 procurement as exploration. Neither a drilling tender nor a successful well by itself establishes commercial generation, a household tariff cut or permanent jobs.
08

Protect living heritage and publish a 90-day delivery record

Bring land users, makers and inland communities into decisions, then show what was done.

Who leads. Local government convenes with the MP, relevant agencies, National Trust, CANARI and participating community organisations; each authority retains its lawful duties.

What residents can do. Bring one documented problem or useful offer to an existing organisation. Elders and young people can record an agreed oral history with consent, credit and a copy returned to the family. Landholders and customary users can identify access concerns privately where needed.

First steps, cost, measures and decision point
Start
Choose three starter commitments through accessible village and inland discussions. Publish the owner, first deliverable, cost basis, funding status and review date. Ask for the current Dorée–Piaye assessment timetable and opportunities to correct draft information.
Next
Review results publicly at day 90. Show how residents' concerns changed a decision. Develop heritage interpretation that includes Indigenous presence, enslaved people's labour and resistance, and the knowledge of living practitioners.
Pay for it and maintain it
Use existing meeting places and records. Budget coordination, paid practitioner time, archiving, accessible participation and necessary technical assessment; obtain permission before promoting private sites.
Measure
Commitments completed; operating funds assigned; affected groups participating; concerns answered; records corrected; practitioners credited and paid.
Decision point
Do not present the proposed Dorée–Piaye landscape as already designated. Verify ownership, access and maintenance before advertising a heritage attraction or endorsing irreversible works.

Who to contact—and what to ask.

Published organisational routes checked during research on 5 September 2026. Phone and email responses were not tested; confirm appointments and programme availability.

Craft-centre access and training

NSDC · 758-458-1677 · mail@nsdc.edu.lc

Ask for the Choiseul coordinator, calendar, equipment access, fees, selling terms and current apprenticeship intake. Contact supported by indexed official content; its full page was unavailable.

Farm machinery and extension advice

Region 6 extension office, Tredu · office secretary 758-468-6857

Confirm the assigned officer for your settlement, machinery availability, booking, charges and trained-operator arrangements.

Three geographies. Conflicting totals.

The profile retains the headline constituency table with a visible caution. It does not use these records to claim rapid growth or rank Choiseul's population.

2022 provisional census records relevant to Choiseul
Published recordHousehold populationHouseholdsHow to use it
Constituency Table 7 / A.810,4243,883Headline retained; reconciliation needed
A.10 Choiseul aggregate7,1192,615Conflicts with headline constituency record
Choiseul district tables7,1222,614District geography; not a constituency substitute

The apparent change from the published 2010 value should not be interpreted as measured demographic growth across a stable boundary. Ask CSO for a settlement-level coding crosswalk and corrected constituency tables. The 2025 election register is a separate administrative record, not an alternative population count.

Research method and remaining limits

This flagship review was completed on 5 September 2026 using official electoral and census records, dated project and service reports, original biographies and historical research, practitioner accounts and external programme evaluations. The profile separates documented milestones, analytical interpretation and proposed actions. Named people’s connections are stated rather than assumed.

Unverified items remain explicit: current craft-centre access and earnings, port handover and operating condition, maintenance-plan award, machinery rules, current service calendars, geothermal award and mobilisation, and landscape designation. No new local interviews or first-hand observations are claimed. Historical and undated sources are labelled; public contact routes were not tested by calling or emailing.

The illustration is an original model based on reference images, and the calculator starts from invented inputs. Neither is new geographic or economic measurement. The source register below records provenance and limitations.

The communities inside Choiseul.

These names come from official electoral descriptions and polling-place records. A community may cross everyday social or service boundaries.

66 selected place labels

  • Anse JohnI2
  • Anse L'IvrogneI1
  • BalcaI9
  • BalemboucheI9
  • BeausoleilI7(a) · I7(b)
  • Belle VueI4
  • Belvedere EastI8
  • Bois D'IndeI1
  • BongaleI9
  • CafeiereI6
  • CapognotteI6
  • Choiseul VillageI3
  • DabanI8
  • DacretinI4 · I6
  • DebreuilI5
  • DelcerI1
50 additional named entriesOpen listClose list
  • Derriere Morne EastI2
  • Derriere Morne WestI1
  • Des RandeauxI4
  • Deville EstateI1
  • DugardI6
  • DupreI5
  • Esperance EastI2
  • Esperance WestI1
  • Fiette EastI2
  • Fiette WestI1
  • FranchouI1
  • Gaya BoisI8
  • GertrineI7(a) · I7(b)
  • GiraudI7(a) · I7(b)
  • Grand MagazinI8
  • IndustryI1
  • JacobieI1
  • La FargueI3
  • La MazeI5
  • La PerleI7(a) · I7(b)
  • La Perle South-WestI9
  • La PointeI1
  • La RicheI3
  • LibereauxI2
  • LondonderryI7(a) · I7(b)
  • MananaI4
  • Martin excluding La RichieI2
  • MiallyI5
  • MondesirI5
  • MongougeI2
  • Mont LezardI8
  • MonzieI5
  • Morne JacquesI4
  • Morne SionI2
  • MoteteI5
  • Myers BridgeI1
  • New FieldI2
  • Parc EstateI8
  • PiayeI9
  • PonyonI2
  • PortaleseI2
  • RavineauI1
  • ReunionI3
  • River DoreeI5
  • RoblotI5
  • SaltibusI8
  • SauzayI6
  • Savanne GeorgeI3
  • VictoriaI2 · I4
  • WarwickI8

66 of 66 entries carry a polling-district code in this release. A missing code means it was not present in the assembled source rows, not that the place sits outside a polling district.

Boundary resources

Check the official description and reference map.

Choiseul reference map (PDF)Central Statistical Office · map vintage 2010 (opens in a new tab)Current constituency descriptionSaint Lucia Electoral Department · site availability can vary (opens in a new tab)

The CSO PDF is an older official reference map with a 2010 map vintage. It may not show later boundary or coding changes. Use it alongside the current official Electoral Department description when that page is available.

Schools, health, safety and climate information.

These notes identify assets, service gaps and risks. They do not turn the number of notes into a performance score.

Education

Schools, skills and community buildings

  • Catty Osman and Irena Alphonse's documented international teaching, Pauline Antoine-Prospere's school service and Choiseul Athletics show several routes for sharing expertise.
  • Combine paid craft learning, supervised youth practice and assisted applications with practical transport and access support.
Health

Care and service access

  • Delcer reopened after SMART rehabilitation in August 2025. La Fargue's January 2026 notice documents outreach and published service hours.
  • Confirm current sessions before travel and connect screening to clinical follow-up. No constituency disease rate or improvement is inferred from these activities.
Safety

Public safety and emergencies

  • Reliable landing operations, competent equipment maintenance, safe learning spaces and accessible routes support everyday safety.
  • Use current agency notices for operating and emergency decisions. The 3-D scene is an illustration, not a navigation or hazard map.
Climate and environment

Hazards, coast and resilience

  • Coastal sedimentation, water-source scarcity, craft materials and the proposed Dorée–Piaye landscape connect livelihoods with environmental management.
  • Saltibus geothermal procurement is exploratory. Residents need stage-specific information, accessible grievance routes and evidence of safeguards and local opportunities.

Ideas to test locally in Choiseul.

These are SLPA proposals for discussion and local validation. They are not an official plan, ranked mandate or finding about what residents want.

  1. 01

    Keep pottery, basketry and other chosen craft skills alive through paid practice and repeat demand.

    SLPA synthesis
  2. 02

    Help makers retain more from a sale and give visitors a bookable local experience.

    SLPA synthesis
  3. 03

    Reduce lost fishing days and avoidable loss of value between landing and sale.

    SLPA synthesis
  4. 04

    Make training and equipment useful to small growers without expanding production into an uncertain market.

    SLPA synthesis
  5. 05

    Make water service improvements visible in homes, schools, clinics and small businesses.

    SLPA synthesis
  6. 06

    Reduce repeat journeys for applications, learning and care, including from Saltibus and dispersed settlements.

    SLPA synthesis
  7. 07

    Let residents understand exploratory work, raise concerns and see whether promised local opportunities materialise.

    SLPA synthesis
  8. 08

    Bring land users, makers and inland communities into decisions, then show what was done.

    SLPA synthesis
Existing assets and reported action

What the current evidence says is in place

  • Craft-centre upgrading, Delcer rehabilitation, La Fargue health activity and 2026 tillage training are documented milestones.
  • The contractor records fishing-port construction completion in 2024; the wider programme includes later monitoring. The 2022 craft export provides an earlier example of a fulfilled buyer order.
Questions to check locally

Open questions for local checking

  • Can makers earn enough per working hour to keep producing and train successors?
  • Who pays for port, machinery and public-facility upkeep after construction?
  • Which journeys and service failures cost inland residents the most time and money?
Open 8 testable policy questions
  1. Needs checking

    Pay master makers to teach through real commissions

    How to check: Mentors paid; learner pieces completed independently; earnings per working hour; repeat orders; learners still practising after three months.
  2. Needs checking

    Build one dependable order, packing and booking service

    How to check: On-time orders; damage and returns; net maker receipts; repeat customers; paying visitors; supplier payment time.
  3. Needs checking

    Give the fishing port an operating and maintenance compact

    How to check: Blocked-access days; surveyed channel condition; fish-preservation ice availability; repair response; equipment uptime; fish rejected or spoiled. Higher catches alone are not proof of healthy fish stocks.
  4. Needs checking

    Connect shared farm machinery to real buyer demand

    How to check: Machine hours and waiting days; cost per serviced plot; fulfilled orders; produce left unsold; payment delays; voluntary net receipts.
  5. Needs checking

    Measure reliable water at the end of the pipe

    How to check: Supply hours with a consistent definition; repeated interruptions; leak response; facility disruption; repairs still working at follow-up.
  6. Needs checking

    Take assisted services to existing inland venues

    How to check: Completed cases; repeat trips; waiting days; estimated travel cost saved; referrals completed; sustained learner participation.
  7. Needs checking

    Give Saltibus a clear geothermal information and follow-up desk

    How to check: Dated milestones; concerns acknowledged and resolved; agreed safeguards disclosed and checked; local paid work; restoration completed.
  8. Needs checking

    Protect living heritage and publish a 90-day delivery record

    How to check: Commitments completed; operating funds assigned; affected groups participating; concerns answered; records corrected; practitioners credited and paid.

Current stage of projects and commitments.

Status reflects the latest clear source in this research base. “Planned,” “under way” and “operating” are different claims.

Project stageDelivered or operatingA source reports that the project opened, was handed over or is operating.Open 7 recordsClose 7 records
October 2025 reopening

Choiseul Arts and Crafts Centre upgrade

Latest sourced status: Existing centre upgraded; NSDC custodian

Government reports approximately EC$800,000 investment. Current opening hours, artisan terms, training intake and net earnings remain to be verified.

S438GIS / Government of Saint Lu
Contractor lists 2024

Choiseul fishing-port construction

Latest sourced status: Construction completion reported by contractor

Obtain handover and present channel-condition records. Later monitoring and possible modification belong to the wider JICA programme; completion does not prove navigability today.

S441JICAS442Hazama Ando Corporation
18 December 2024 report

Choiseul cooperative sea-moss support

Latest sourced status: Raft farming, training and processing support documented

Reported FDA registration is not product approval, a current validity check, export revenue or evidence of profitability.

S445Agriculture Ministry / JICA
29 January 2026 report

BRACCCVAS tillage training

Latest sourced status: Hands-on farmer training delivered

Confirm current machinery, booking, operator and maintenance arrangements. Local output and income effects unverified.

S446Agriculture Ministry
26 August 2025 reopening

Delcer Wellness Centre SMART rehabilitation

Latest sourced status: Rehabilitation and reopening documented

Includes water storage and accessibility work; confirm current sessions and referral routes.

S451Health Ministry / Government
22 January 2026 notice

La Fargue Wellness Centre services and outreach

Latest sourced status: Open day, health fair and service schedule published

Published schedule includes Saturday morning; confirm current hours and the service needed before travel.

S452Health Ministry / Government
Project stageIn progressA current source shows construction, procurement, commissioning or another active delivery step.Open 1 recordClose 1 record
11 February 2026 report

FISH-ADAPT: Choiseul assessment

Shared city or regional asset: the location and service area are described below.

Latest sourced status: Choiseul included in fisheries needs assessment

Island-wide project; local training delivery and beneficiary counts require confirmation. National targets are not constituency allocations.

S447Agriculture Ministry
Project stagePlanned or fundedFunding, a budget line or an announced plan exists, but delivery is not yet established.Open 1 recordClose 1 record
28 July 2026 tender

Saltibus exploratory geothermal well

Shared city or regional asset: the location and service area are described below.

Latest sourced status: Exploratory drilling services being procured

Three-well procurement includes Saltibus. Deadline 7 October 2026; award and drilling start not established. No commercial-generation promise inferred.

S453Physical Development / GoverS454Govt. of Saint Lucia
Project stageStatus needs checkingThe latest public source does not establish the current stage clearly enough.Open 2 recordsClose 2 records
13 May 2026 procurement

Port monitoring and life-cycle maintenance planning

Shared city or regional asset: the location and service area are described below.

Latest sourced status: Maintenance and sustainable-finance plans requested

Choiseul and Soufrière are included. June submission deadline has passed; award, accepted plans and funded implementation not located.

S441JICAS443Japan Ministry of Foreign AfS444Government of Saint Lucia /
28 May 2026 assessment procurement

Proposed Dorée–Piaye protected landscape

Shared city or regional asset: the location and service area are described below.

Latest sourced status: Land-use and tenure assessment requested

Wider landscape process. Completed assessment, legal designation, access arrangements and benefit scheme unverified.

S448CANARI
National programmes relevant to this areaNational envelopes are not local allocationsOpen 3 recordsClose records

These programmes apply across Saint Lucia. The amounts below are national 2026/27 budget envelopes; this research base does not establish how much is allocated to or spent in Choiseul.

National programme

Community Development Programme

National programme reference; estimates require revalidation. No Choiseul allocation inferred.

S006Government of Saint Lucia, M
National programme

Community Tourism Programme

National programme reference; estimates require revalidation. No Choiseul allocation inferred.

S006Government of Saint Lucia, M
National programme

Tourism Enhancement Programme

National programme reference; estimates require revalidation. No Choiseul allocation inferred.

S006Government of Saint Lucia, M

Review the findings, sources and missing information.

The notebook keeps sourced facts, institutional context and SLPA analysis visible as different kinds of evidence.

How the evidence labels work
Published fact

A sourced official or primary record

Institutional context

An older or broader institutional source

SLPA synthesis

Analysis that must not be read as an official finding

Hypothesis

A testable question that needs local evidence

Research notesKey numberOpen 1 findingsClose findings
  1. Published factChoiseul; other geographies identified

    Table 7/A.8 gives 10,424 household residents and 3,883 households; A.10 differs. The 2010–22 change and constituency population rank are withheld pending geographic reconciliation.

    S420CSO
Research notesEconomyOpen 1 findingsClose findings
  1. Needs checkingChoiseul; other geographies identified

    The Maryland craft shipment occurred in 2022 after a 2021 buyer introduction. January 2026 tillage training is documented; neither record establishes present earnings or sustained output gains.

    S439The STARS462Export Saint LuciaS446Agriculture Ministry
Research notesInfrastructure and servicesOpen 2 findingsClose findings
  1. Needs checkingChoiseul; other geographies identified

    The port contractor lists construction completion in 2024. JICA's scope includes subsequent monitoring and possible modification; a May 2026 UBEC notice seeks maintenance and financing plans.

    S441JICAS442Hazama Ando CorporationS444Government of Saint Lucia /
  2. Needs checkingChoiseul; other geographies identified

    Victoria's storage facility opened in 2024. WASCO's August 2026 Delcer report separates a resolved transmission restriction from continuing low source flow.

    S449Govt. of Saint LuciaS450WASCO / Government of Saint
Research notesHealthOpen 1 findingsClose findings
  1. Needs checkingChoiseul; other geographies identified

    Delcer rehabilitation and La Fargue's 2026 open day demonstrate facility and outreach activity, not measured changes in population health.

    S451Health Ministry / GovernmentS452Health Ministry / Government
Research notesEnvironment and climateOpen 2 findingsClose findings
  1. Needs checkingChoiseul; other geographies identified

    St. Lucia Times reported sargassum landings in Choiseul and Soufrière on 10 May 2025. This is a dated local report, not a finding of current accumulation or blocked access in September 2026.

    S481Keira St. Rose / St. Lucia T
  2. Needs checkingChoiseul; other geographies identified

    July 2026 procurement includes a projected 1,500-metre exploratory well at Saltibus. The published deadline is 7 October; commercial generation and tariff savings are not established.

    S453Physical Development / GoverS454Govt. of Saint Lucia
Research notesStrength / assetOpen 1 findingsClose findings
  1. Needs checkingChoiseul; other geographies identified

    Catty Osman and Irena Alphonse demonstrated pottery internationally in 1998. Named artists, educators and cultural practitioners offer further examples of community knowledge and contribution.

    S430Finola Jennings-ClarkS431Patricia J. FayS434UN ECLACS437SLHTA / Island Visions
Research notesWhat is workingOpen 1 findingsClose findings
  1. Needs checkingChoiseul; other geographies identified

    The October 2025 craft-centre record describes an approximately EC$800,000 upgrade of an existing facility with NSDC as custodian. Current access, income and training results require follow-up.

    S438GIS / Government of Saint Lu
Research notesPotentially neglected issueOpen 1 findingsClose findings
  1. Needs checkingWider Laborie–Choiseul landscape

    The proposed Dorée–Piaye landscape's assessment scope includes land tenure, customary access and benefit sharing. It is not treated as an already designated protected landscape.

    S448CANARI
Research notesHistorical community signalOpen 1 findingsClose findings
  1. Needs checkingChoiseul; other geographies identified

    Choiseul's Indigenous archaeological record and its Creole pottery history require distinct treatment. Fay's research identifies African technical inheritance among women potters whose Creole way of life developed after emancipation.

    S424Saint Lucia Department of FiS425Patricia J. Fay / University
Research notesElection factOpen 1 findingsClose findings
  1. Needs checkingChoiseul; other geographies identified

    The 2025 result records 5,705 ballots, 247 rejected and 5,458 valid. Keithson Charles received 2,941 votes and John Bradly Felix 2,517; turnout was 59.81% against 9,539 register entries.

    S421Electoral Dept.S422Govt. of Saint Lucia
Open evidence gaps

What we still need to know

  1. 01

    Conflicting census totals and electoral crosswalk.

    Place labels, districts and constituency aggregates cannot be interchanged.

    Useful next source: CSO correction with settlement-to-constituency coding and electoral boundary reconciliation.
  2. 02

    Craft-centre operating terms and sustained maker earnings.

    An upgrade or training announcement does not establish access or viable work.

    Useful next source: NSDC calendar, access agreement, paid apprenticeship records and consenting maker cost/order logs.
  3. 03

    Port handover, current channel condition and funded maintenance.

    Construction completion and a wider project end date describe different possible stages.

    Useful next source: Fisheries/JICA handover and monitoring records; UBEC award, accepted plan and operating budget.
  4. 04

    Machinery service and sea-moss commercial results.

    Training, equipment and registration do not show net income.

    Useful next source: Extension booking/maintenance records; cooperative production, handling, sales and cost records.
  5. 05

    Water continuity and inland service access.

    Facility openings and old schedules do not capture present household experience.

    Useful next source: WASCO zone records; consistent voluntary supply logs; verified clinic and assistance calendars.
  6. 06

    Geothermal stage, safeguards and landscape participation.

    Exploration and proposed designation need accessible, dated information.

    Useful next source: RESDP award/mobilisation notices and grievance reporting; CANARI accepted assessment and consultation records.
Source register56 records linked to this profileOpen sourcesClose sources
  1. S006
    Estimates of Revenue and Expenditure 2026/2027 (opens in a new tab)

    Government of Saint Lucia, Ministry of Finance · 2026

    Inherited 2026/27 estimates remain unavailable for revalidation; amounts withheld. National reference is not a constituency allocation.
    Official / primary
  2. S420
    2022 provisional census: Choiseul constituency tables (opens in a new tab)

    Central Statistical Office / CARICOM · 2022 census; Release 2

    Table 7 p26/A.8 p46: 10,424 household residents and 3,883 households. A.10 p62: 7,119 and 2,615. District tables report 7,122 and 2,614. Geographic reconciliation needed; trend and rank withheld.
    Official / primary
  3. S421
    Choiseul: 2025 election result (opens in a new tab)

    Saint Lucia Electoral Department · 2025 election

    5,705 ballots include 247 rejected; 5,458 valid. Charles 2,941; Felix 2,517. Register 9,539; turnout 59.81%. Register entries are not resident population.
    Official / primary
  4. S422
    Cabinet of Ministers (opens in a new tab)

    Government of Saint Lucia

    Checked 5 September 2026: Keithson Hermine Charles, Physical Development and Public Utilities. Current role, not a claim of project delivery.
    Official / primary
  5. S423
    Choiseul constituency I: polling descriptions (opens in a new tab)

    Saint Lucia Electoral Department

    Checked I1–I9 including I7(a)/(b), Saltibus I8 and Balembouche I9. Selected labels are not parcel boundaries. Historical representative section is outdated.
    Official / primary
  6. S424
    Southern Quadrant: Choiseul heritage and livelihoods (opens in a new tab)

    Saint Lucia Department of Finance

    Indigenous petroglyphs, canoe-making, fishing and farming history; name attributed to Duke of Choiseul. Not a current economic survey; no Indigenous disappearance claim adopted.
    Institutional / older
  7. S425
    Creole Clay: Heritage Ceramics in the Contemporary Caribbean (opens in a new tab)

    Patricia J. Fay / University Press of Florida; UBC distribution · 2017 book; 2019 paperback

    Description and bibliographic record read, not the full book. Two decades of research; post-emancipation Choiseul women potters and African inherited techniques. Do not equate all local pottery with unchanged Indigenous practice.
    Institutional / older
  8. S426
    St. Lucia's Traditional Pottery: an Endangered Craft (opens in a new tab)

    Finola Jennings-Clark · 27 June 2010

    Documents clay preparation, family labour and open firing in named communities in 2010. No present practitioner count or land-tenure finding; recalled mineral chemistry omitted.
    Specialist / community
  9. S427
    Creating a cultural tourism district (opens in a new tab)

    CDF / Government of Saint Lucia · 15 September 2017

    Reports low returns, arduous work and declining transmission. Proposed cultural district is not verified implementation or UNESCO inscription.
    Institutional / older
  10. S428
    Addressing sugar plantations as sites of forgetting on Saint Lucia (opens in a new tab)

    Arun Sood, Marenka Thompson-Odlum and Ashley Coutu / Island Studies Journal · 2026; 21(1), pp230–250

    2022 fieldwork at Balenbouche with AHS and SALCC; 203 enslaved people in 1815, escape attempts in 1827, sugar works largely abandoned by 1896. Suggested escape routes are inference; current electoral spelling is Balembouche I9.
    Official / primary
  11. S429
    National Trust welcomes measures to preserve Choiseul windmills (opens in a new tab)

    Saint Lucia National Trust / The STAR · 24 July 2020

    Morne Sion property-acquisition negotiations; completed purchase, restoration and public access not established.
    Institutional / older
  12. S430
    St. Lucia's Traditional Crafts: Pottery (opens in a new tab)

    Finola Jennings-Clark · 11 June 2010

    Catty Osman at Morne Sion; Irena Alphonse at Matin; teaching and sculptural adaptation. Historical roles, not present activity claims.
    Specialist / community
  13. S431
    Patricia Fay: curriculum vitae (opens in a new tab)

    Patricia J. Fay

    Records Osman and Alphonse demonstrating Caribbean bonfire pottery at NCECA, Fort Worth, 25–28 March 1998.
    Institutional / older
  14. S432
    About Daniel Jean-Baptiste (opens in a new tab)

    Daniel Jean-Baptiste

    Supports growing up in Choiseul, childhood fishing from its wooden jetty, and silk-painting practice. No unsupported earnings, collections or superlative claims.
    Institutional / older
  15. S433
    Poems from Saint Lucia: Llewellyn Xavier exhibition review (opens in a new tab)

    John Robert Lee / Jako Productions · 3 January 2025; reviews May 2024 exhibition

    Identifies Xavier as Choiseul-born and discusses ecological/recycled-material work. Article date is not exhibition date.
    Institutional / older
  16. S434
    Pauline Antoine-Prospere: biographical profile (opens in a new tab)

    UN ECLAC · 2025 Sustainable Development Forum

    Saltibus upbringing; 37-year education career, Delcer and Grace principalships, school and credit-union service. 2025 political office is not used as current title.
    Official / primary
  17. S435
    Team Saint Lucia is ready for CARIFTA 2025 (opens in a new tab)

    Saint Lucia Athletics Association / Government · 10 April 2025

    Supports Jady Emmanuel's Choiseul Athletics affiliation; does not establish Choiseul birthplace.
    Official / primary
  18. S436
    Jady Emmanuel's Morne Paul origins and athletics (opens in a new tab)

    St Lucia Times · 13 March 2026

    Morne Paul, Laborie native with Choiseul school/club connection. No personal health detail repeated.
    Institutional / older
  19. S437
    Visions of St. Lucia: local people and their stories (opens in a new tab)

    SLHTA / Island Visions · 2005 edition; interviews June 2004

    Heran Jn Baptiste of La Pointe: fishing and Shack-Shack music. Eudovic discusses teaching at La Fargue. Historical contribution; neither is assumed currently active.
    Institutional / older
  20. S438
    Minister outlines vision for community-based tourism (opens in a new tab)

    GIS / Government of Saint Lucia · 17 October 2025

    Approximately EC$800,000 upgrade of existing Choiseul centre; NSDC custodian. Programme plans are not verified current intake, maker earnings or operating results.
    Official / primary
  21. S439
    Choiseul crafters complete historic export to USA (opens in a new tab)

    The STAR · 10 March 2022

    Securely dates the Maryland shipment to 2022, following a 2021 buyer introduction. No export value or repeat-order series.
    Institutional / older
  22. S440
    National Trust targets younger generation to preserve Choiseul crafts (opens in a new tab)

    Sharefil Gaillard / Saint Lucia Daily Post · 31 August 2026

    Finola Jennings-Clarke describes succession concerns. No practitioner age census; questionable international observance date omitted.
    Institutional / older
  23. S441
    Signing of grant agreement: Choiseul fishing port (opens in a new tab)

    JICA · 11 November 2022

    Up to ¥1,263m; 54-month programme includes sedimentation monitoring and possible modification after construction. Provisional dimensions are not as-built quantities.
    Official / primary
  24. S442
    The Project for the Improvement of Choiseul Fishing Port (opens in a new tab)

    Hazama Ando Corporation · Completion 2024; page undated

    Explicit completion year 2024 and photographs. No handover certificate, exact date, present operating depth or proof of permanent sediment control.
    Official / primary
  25. S443
    Japan's Grant Aid: Choiseul fishing port commitment (opens in a new tab)

    Japan Ministry of Foreign Affairs / UN SDGs

    Indexed UN record lists 1 October 2022–31 March 2027. Direct retrieval failed on review; planned programme horizon, not delivery proof. Main stage assessment also rests on retrieved JICA scope and contractor record.
    Needs checking
  26. S444
    Life-cycle maintenance plans for fisheries infrastructures (opens in a new tab)

    Government of Saint Lucia / UBEC · 13 May 2026

    Choiseul and Soufrière included; sustainable finance and maintenance plans requested. Deadline 18 June, expected four-month engagement. Award and accepted outputs not verified.
    Official / primary
  27. S445
    Choiseul Fishermen's Cooperative sea-moss initiative (opens in a new tab)

    Agriculture Ministry / JICA · 18 December 2024

    Raft farming, training, processing space and reported FDA registration. Registration is not product approval, export sales or proven profit; current validity not established.
    Official / primary
  28. S446
    Strengthening farming from the ground up in Choiseul (opens in a new tab)

    Agriculture Ministry · 29 January 2026

    BRACCCVAS hands-on tillage training. No machine entitlement, current booking rules, hectares served or measured yield gains established.
    Official / primary
  29. S447
    FISH-ADAPT climate resilience and safety (opens in a new tab)

    Agriculture Ministry · 11 February 2026

    Choiseul among assessment locations. National beneficiary target is not a constituency allocation; planned boatbuilding training is not a local completion count.
    Official / primary
  30. S448
    Dorée–Piaye land-use expert terms of reference (opens in a new tab)

    CANARI · 28 May 2026

    Proposed protected landscape; land tenure, customary access, gender and benefit sharing. Completed assessment, formal designation and agreed benefits not established.
    Official / primary
  31. S449
    Victoria, Choiseul water storage facility opens (opens in a new tab)

    Government of Saint Lucia · 13 August 2024

    100,000-gallon facility, opened 9 August. Named service areas include Belle Vue, Dacretin, Derriere Morne, Morne Sion, Fond Cacoa, Bois Den and Mongouge. Does not prove 2026 continuous supply.
    Official / primary
  32. S450
    WASCO statement on Delcer network supply conditions (opens in a new tab)

    WASCO / Government of Saint Lucia · 18 August 2026

    Unionville transmission restriction resolved, restoring former plant capacity; low source flow persisted. Alleged interference remained under investigation; no individual blamed. Not a live September schedule.
    Official / primary
  33. S451
    Delcer Wellness Centre reopens after SMART rehabilitation (opens in a new tab)

    Health Ministry / Government · 26 August 2025

    Structural, electrical, plumbing/water storage and accessibility improvements. Current sessions and clinical outcomes require separate confirmation.
    Official / primary
  34. S452
    La Fargue Wellness Centre open day and health fair (opens in a new tab)

    Health Ministry / Government · 22 January 2026

    Published Monday–Friday 8–4:30, Saturday 8–noon; confirm before travel. Screening and education activities are not disease prevalence or outcome measures.
    Official / primary
  35. S453
    Drilling rig and integrated drilling services: RESDP (opens in a new tab)

    Physical Development / Government · 28 July 2026

    Three exploratory wells including projected 1,500m Saltibus well; bid deadline 7 October 2026. Local Labour Method Statement required. Award, drilling start, commercial generation and tariff savings not established.
    Official / primary
  36. S454
    Notification of RESDP resettlement action plan (opens in a new tab)

    Government of Saint Lucia · 2 September 2025

    Links RAP and project grievance procedure. Historical consultation deadline has passed; not advertised as a current application window.
    Official / primary
  37. S455
    Fine mats: master teaching and sponsorship (opens in a new tab)

    Women in Business Development Inc., Samoa

    Master-weaver teaching, sponsored production and adaptation difficulties. Not a causal earnings evaluation or proof of financial self-sufficiency.
    Institutional / older
  38. S456
    How WIBDI supports fine-mat weavers (opens in a new tab)

    Samoa Ministry of the Prime Minister and Cabinet · 9 March 2023

    Contracts, payments during production, fortnightly field checks and financial literacy. Participant accounts do not establish average earnings or causal impact.
    Official / primary
  39. S457
    EU–Bhutan Trade Support Project closing results (opens in a new tab)

    European Union / EEAS · 19 September 2022

    2018–22 programme: 320 textile-handicraft designs and over 2,000 units exported. Outputs, not net income or sustained jobs; 1,400 beneficiaries cover farmers and SMEs as well as artisans.
    Official / primary
  40. S458
    Entrepreneurship ecosystem in Bhutan (opens in a new tab)

    International Trade Centre · 2019 research snapshot; publication undated

    Growth-stage, packaging, quality and follow-up gaps. Study excludes international-agency programmes; contextual counterevidence, not evaluation of the EU project.
    Official / primary
  41. S459
    Evaluation of Bhutan G2C service delivery initiative (opens in a new tab)

    UNDP · 2013; April–June evaluation

    Reported travel/time savings; only 23 of 101 centres online, consumable and agency-process failures, subsidy concerns. Historical study with sampling limits, not a causal trial.
    Official / primary
  42. S460
    Gouyave fishing-community infrastructure ex-post evaluation (opens in a new tab)

    JICA / IC Net · 2015; evaluation November 2014–October 2015

    Logs and technician checks; effectiveness high, sustainability fair. Ice-machine failure and only two of eight intended vendors operating. Filename year is not final survey date.
    Official / primary
  43. S461
    Grenada fishery equipment and machinery evaluation (opens in a new tab)

    JICA Saint Lucia Office · December 2022

    Ice output 55% of 2019 target, reduced technical staff and maintenance funding constraints. Partially satisfactory; COVID restricted site visits. Filename 2021 is not evaluation date.
    Official / primary
  44. S462
    Choiseul craft association shipment and exporter support (opens in a new tab)

    Export Saint Lucia · Original shipment 2022; displayed date lacks reliable year

    Buyer introduction in 2021 led to shipment dated by contemporaneous STAR report to 2022. Apparent 2026 search date not used as event date. Published support contact: 468-2145, info@exportsaintlucia.org.
    Official / primary
  45. S463
    NSDC: published contact (opens in a new tab)

    National Skills Development Centre

    Indexed official content supports 458-1677 and mail@nsdc.edu.lc. Direct retrieval returned 502. Contact not tested; current Choiseul timetable unverified.
    Institutional / older
  46. S464
    Region 6 extension office directory (opens in a new tab)

    Agriculture Ministry

    Tredu; office secretary 468-6857. Confirm assigned officer for settlement. Undated contact content; inconsistent region-head labels not reproduced.
    Official / primary
  47. S465
    Fisheries Department contact directory (opens in a new tab)

    Government of Saint Lucia

    468-4143; deptfish@govt.lc. Undated directory, not telephone-tested.
    Official / primary
  48. S466
    RESDP grievance redress mechanism (opens in a new tab)

    Renewable Energy Sector Development Project

    Windia Jaunai: 732-0030, grievances.resdp@govt.lc. Dedicated procedure and 2023 government notice agree; contact-page 723 variant not used. Published response standards are commitments, not measured performance.
    Official / primary
  49. S467
    Choiseul, the cradle of craft (opens in a new tab)

    Stan Bishop / Saint Lucia Tourism Authority · 20 April 2020

    Parish 1765, River Dorée Anglican church 1846, school 1848, village Catholic church completed 1914. Erroneous English 'chosen' etymology omitted; no 2026 officeholder inference.
    Institutional / older
  50. S468
    An American potter in Creole clay (opens in a new tab)

    Nina Barbero / FGCU360 · 26 October 2017

    Corroborates Catty Osman's collaboration in Patricia Fay's Choiseul research.
    Official / primary
  51. S469
    Choiseul Art Gallery (opens in a new tab)

    Leo and Hattie Barnard

    Distinct River Dorée enterprise. Published seasonal closure August–September; confirm before visiting. No current sales or visitor totals.
    Institutional / older
  52. S470
    Household infrastructure: district evidence and definitions (opens in a new tab)

    Saint Lucia Policy Analysis · 2022 census-based analysis

    Choiseul district weighted household base 2,614; information and housing indicators use stated definitions. Not current constituency caseload, income poverty or water continuity.
    Specialist / community
  53. S480
    Choiseul and Soufrière fisheries facilities: ice-making and fish handling (opens in a new tab)

    Government of Saint Lucia / NationWide · 24 May 2003

    Pages 1 and 8 describe manufactured ice for catch preservation, clean handling and water. Not a record of 2026 output, machine condition, prices or shortages.
    Institutional / older
  54. S481
    Sargassum Crisis Deepens (opens in a new tab)

    Keira St. Rose / St. Lucia Times · 10 May 2025

    Reports heavy landings in Choiseul and Soufrière; photograph identifies Soufrière Bay. Named fisher testimony is from other communities. No September 2026 shoreline condition or local blockage inferred.
    Institutional / older
  55. S486
    National Trust seeks youth to keep Choiseul crafts alive (opens in a new tab)

    MBC Saint Lucia · 1 September 2026; report dated 31 August

    Companion to Real FM public post and 31 August local reporting. A named heritage official’s succession concern, not a census of makers or measured apprentice retention.
    Institutional / older
  56. S492
    National Trust seeks youth: public broadcast post (opens in a new tab)

    Real FM 91.3 · 31 August 2026 caption

    Full Facebook post/video unavailable. MBC companion and Daily Post article provide readable corroboration. No new SLPA interview claimed.
    Specialist / community